On feedback queueing system with reneging and retention of reneged customers, multiple working vacations and Bernoulli schedule vacation interruption

被引:23
|
作者
Bouchentouf A.A. [1 ]
Yahiaoui L. [2 ]
机构
[1] Department of Mathematics, Mathematics Laboratory, Djillali Liabes University of Sidi Bel Abbes, B. P. 89, Sidi Bel Abbes
[2] Department of Mathematics, Dr. Moulay Taher University, Saida
关键词
60K25; 68M20; 90B22;
D O I
10.1007/s40065-016-0161-1
中图分类号
学科分类号
摘要
This paper presents an analysis of a Markovian feedback queueing system with reneging and retention of reneged customers, multiple working vacations and Bernoulli schedule vacation interruption, where customers’ impatience is due to the servers’ vacation. The reneging times are assumed to be exponentially distributed. After the completion of service, each customer may reenter the system as a feedback customer for receiving another regular service with some probability or leave the system. A reneged customer can be retained in many cases by employing certain convincing mechanisms to stay in queue for completion of service. Thus, a reneged customer can be retained in the queueing system with some probability or he may leave the queue without receiving service. We establish the stationary analysis of the system. The probability generating functions of the stationary state probabilities is obtained, we deduce the explicit expressions of the system sizes when the server is in a normal service period and in a Bernoulli schedule vacation interruption, respectively. Various performance measures of the system are derived. Finally, we present some numerical examples to demonstrate how the various parameters of the model influence the behavior of the system. © 2017, The Author(s).
引用
收藏
页码:1 / 11
页数:10
相关论文
共 50 条
  • [31] OPTIMIZATION OF RENEWAL INPUT (a, c, b) POLICY WORKING VACATION QUEUE WITH CHANGE OVER TIME AND BERNOULLI SCHEDULE VACATION INTERRUPTION
    Laxmi, P. Vijaya
    Goswami, V.
    Seleshi, D.
    TWMS JOURNAL OF APPLIED AND ENGINEERING MATHEMATICS, 2014, 4 (02): : 131 - 146
  • [32] SINGLE SERVER MARKOVIAN QUEUEING SYSTEM WITH WORKING VACATION, IMPATIENT CUSTOMERS AND DISASTERS
    Yohapriyadharsini, R. S.
    Suvitha, V.
    MATHEMATICS IN APPLIED SCIENCES AND ENGINEERING, 2025,
  • [33] Multiple Control Policy in Unreliable Two-Phase Bulk Queueing System with Active Bernoulli Feedback and Vacation
    Niranjan, S. P.
    Latha, S. Devi
    Mahdal, Miroslav
    Karthik, Krishnasamy
    MATHEMATICS, 2024, 12 (01)
  • [34] Analysis of a Two-Phase Queueing System with Impatient Customers and Multiple Vacations
    Yue, Dequan
    Yue, Wuyi
    Li, Xiuju
    OPERATIONS RESEARCH AND ITS APPLICATIONS: IN ENGINEERING, TECHNOLOGY AND MANAGEMENT, 2011, 14 : 292 - +
  • [35] An M/G/1 Bernoulli feedback retrial queueing system with negative customers
    Kumar, B. Krishna
    Madheswari, S. Pavai
    Lakshmi, S. R. Anantha
    OPERATIONAL RESEARCH, 2013, 13 (02) : 187 - 210
  • [36] An M/G/1 Bernoulli feedback retrial queueing system with negative customers
    B. Krishna Kumar
    S. Pavai Madheswari
    S. R. Anantha Lakshmi
    Operational Research, 2013, 13 : 187 - 210
  • [37] A cold standby repairable system with working vacations and vacation interruption following Markovian arrival process
    Liu, Baoliang
    Cui, Lirong
    Wen, Yanqing
    Shen, Jingyuan
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2015, 142 : 1 - 8
  • [38] An M/M/1 Queueing-Inventory System with Working Vacations, Vacation Interruptions and Lost Sales
    R. Manikandan
    S. S. Nair
    Automation and Remote Control, 2020, 81 : 746 - 759
  • [39] IMPATIENT CUSTOMERS IN MARKOVIAN QUEUE WITH BERNOULLI FEEDBACK AND WAITING SERVER UNDER VARIANT WORKING VACATION POLICY
    Bouchentouf, Amina Angelika
    Yahiaoui, Lahcene
    Kadi, Mokhtar
    Majid, Shakir
    OPERATIONS RESEARCH AND DECISIONS, 2020, 30 (04) : 5 - 28
  • [40] An M/M/1 Queueing-Inventory System with Working Vacations, Vacation Interruptions and Lost Sales
    Manikandan, R.
    Nair, S. S.
    AUTOMATION AND REMOTE CONTROL, 2020, 81 (04) : 746 - 759