共 50 条
- [22] Ranking hotels using aspect ratings based sentiment classification and interval-valued neutrosophic TOPSIS [J]. International Journal of System Assurance Engineering and Management, 2019, 10 : 973 - 983
- [23] Model and Solution for Steelmaking-Continuous Casting Scheduling Problem Based on Constraint Programming Method [J]. 2009 INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND COMPUTER SCIENCE, VOL 1, PROCEEDINGS, 2009, : 19 - 22
- [24] Decision-making problem based on generalized interval-valued bipolar neutrosophic Einstein fuzzy aggregation operator [J]. Soft Computing, 2023, 27 : 14533 - 14551
- [27] Capital Asset Pricing Model Using Copula Based SUR for Interval-Valued Energy Index [J]. 2018 4TH INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT (ICIM2018), 2018, : 22 - 27
- [28] A Constraint Programming Model for the Scheduling Problem with Flexible Maintenance under Human Resource Constraints [J]. ICAART: PROCEEDINGS OF THE 14TH INTERNATIONAL CONFERENCE ON AGENTS AND ARTIFICIAL INTELLIGENCE - VOL 3, 2022, : 195 - 202
- [30] Interval model-based diagnosis using constraint programming [J]. SOFT COMPUTING WITH INDUSTRIAL APPLICATIONS, VOL 17, 2004, 17 : 219 - 228