共 50 条
- [32] Supply chain plant location problem with the product structure tree under the time window PROCEEDINGS OF THE 2005 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (12TH), VOLS 1- 3, 2005, : 662 - 669
- [38] Hybrid meta-heuristic algorithm for job shop scheduling with due date time window and release time INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 67 (1-4): : 59 - 71
- [39] Hybrid meta-heuristic algorithm for job shop scheduling with due date time window and release time The International Journal of Advanced Manufacturing Technology, 2013, 67 : 59 - 71
- [40] RESEARCH ON COMMON DUE-WINDOW ASSIGNMENT SCHEDULING WITH POSITIONAL DEPENDENT PROCESSING TIME AND GROUP TECHNOLOGY International Journal of Innovative Computing, Information and Control, 2024, 20 (05): : 1541 - 1554