共 50 条
- [31] Key problems faced in high-speed train operation [J]. JOURNAL OF ZHEJIANG UNIVERSITY-SCIENCE A, 2014, 15 (12): : 936 - 945
- [32] Research on the Status and Prospect of the Hollow Shafts Forming Technology in High-Speed Train [J]. ADVANCES IN ENGINEERING DESIGN AND OPTIMIZATION III, PTS 1 AND 2, 2012, 201-202 : 1071 - 1075
- [33] Laws of high-speed train operation speed acting on line capacity [J]. Jiaotong Yunshu Gongcheng Xuebao/Journal of Traffic and Transportation Engineering, 2015, 15 (06): : 68 - 74
- [34] Research on Aerodynamic Brake of High-speed Train [J]. INFORMATION ENGINEERING FOR MECHANICS AND MATERIALS SCIENCE, PTS 1 AND 2, 2011, 80-81 : 932 - +
- [35] Automatic Operation Speed Control of High-speed Train Based on ADRC [J]. Liu, Bohong (liubohong@mail.lzjtu.cn), 1600, Science Press (42):
- [36] Research of China High-Speed Train Transport Operation System based on Autonomous Integration [J]. ISADS 2009: 2009 INTERNATIONAL SYMPOSIUM ON AUTONOMOUS DECENTRALIZED SYSTEMS, PROCEEDINGS, 2009, : 171 - 175
- [37] Train Operation Plan Research of Guangzhou-Shenzhen(HK) High-speed Railway [J]. 2011 INTERNATIONAL CONFERENCE ON ECONOMIC, EDUCATION AND MANAGEMENT (ICEEM2011), VOL III, 2011, : 384 - 387
- [38] Method Research for High-speed Train Operation Adjustment Based on Immune Genetic Algorithm [J]. 2016 INTERNATIONAL CONFERENCE ON LOGISTICS, INFORMATICS AND SERVICE SCIENCES (LISS' 2016), 2016,
- [40] Working out an incomplete cyclic train timetable for high-speed railways by computer [J]. COMPUTERS IN RAILWAYS XII: COMPUTER SYSTEM DESIGN AND OPERATION IN RAILWAYS AND OTHER TRANSIT SYSTEMS, 2010, 114 : 889 - 900