共 50 条
- [13] NSGA-II with Iterated Greedy for a Bi-objective Three-stage Assembly Flowshop Scheduling Problem GECCO'14: PROCEEDINGS OF THE 2014 GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, 2014, : 429 - 436
- [14] A hybrid NSGA-II and VNS for solving a bi-objective no-wait flexible flowshop scheduling problem INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 75 (5-8): : 1017 - 1033
- [16] A bi-objective production planning for a flexible supply chain solved using NSGA-II and MOPSO INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT, 2022, 13 (01): : 18 - 37
- [17] A memetic NSGA-II for the bi-objective mixed capacitated general routing problem Journal of Heuristics, 2015, 21 : 359 - 390