共 50 条
- [31] Some single machine scheduling problems with resource dependent set-up and processing times OPERATIONS RESEARCH PROCEEDINGS 2000, 2001, : 60 - 64
- [32] On some single-machine scheduling with sequences-dependent set-up times INFORMATION INTELLIGENCE AND SYSTEMS, VOLS 1-4, 1996, : 1162 - 1165
- [34] Two-machine flowshop scheduling problem to minimize maximum lateness with bounded setup and processing times KUWAIT JOURNAL OF SCIENCE & ENGINEERING, 2006, 33 (02): : 233 - 252
- [35] Scheduling to minimize the maximum lateness with multiple product-classes in batch processing 2002 IEEE REGION 10 CONFERENCE ON COMPUTERS, COMMUNICATIONS, CONTROL AND POWER ENGINEERING, VOLS I-III, PROCEEDINGS, 2002, : 1595 - 1598
- [40] HEURISTIC PROCEDURES FOR SINGLE MACHINE PROBLEM TO MINIMIZE MAXIMUM LATENESS AIIE TRANSACTIONS, 1978, 10 (02): : 176 - 183