A Multi-Level Selective Maintenance Strategy Combined to Data Mining Approach for Multi-Component System Subject to Propagated Failures

被引:0
|
作者
Mohamed Ali Kammoun
Zied Hajej
Nidhal Rezg
机构
[1] Université de Lorraine,
[2] LGIPM,undefined
[3] École polytechnique du Groupe Honoris United Universities,undefined
关键词
Selective maintenance; stochastic dependence; age acceleration factor; data mining; flexible manufacturing system;
D O I
暂无
中图分类号
学科分类号
摘要
In several industrial fields like air transport, energy industry and military domain, maintenance actions are carried out during downtimes in order to maintain the reliability and availability of production system. In such a circumstance, selective maintenance strategy is considered the reliable solution for selecting the faulty components to achieve the next mission without stopping. In this paper, a novel multi-level decision making approach based on data mining techniques is investigated to determine an optimal selective maintenance scheduling. At the first-level, the age acceleration factor and its impact on the component nominal age are used to establish the local failures. This first decision making employed K-means clustering algorithm that exploited the historical maintenance actions. Based on the first-level intervention plan, the remaining-levels identify the stochastic dependence among components by relying upon Apriori association rules algorithm, which allows to discover of the failure occurrence order. In addition, at each decision making level, an optimization model combined to a set of exclusion rules are called to supply the optimal selective maintenance plan within a reasonable time, minimizing the total maintenance cost under a required reliability threshold. To illustrate the robustness of the proposed strategy, numerical examples and a FMS real study case have been solved.
引用
收藏
页码:313 / 337
页数:24
相关论文
共 50 条
  • [41] Preventive maintenance strategy for multi-component systems in dynamic risk assessment
    Zhang, Chengjie
    Fang, Zhigeng
    Dong, Wenjie
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2025, 254
  • [42] A predictive maintenance strategy for multi-component systems using importance measure
    Kim-Anh Nguyen
    Phuc Do Van
    Grall, Antoine
    SAFETY, RELIABILITY AND RISK ANALYSIS: BEYOND THE HORIZON, 2014, : 967 - 975
  • [43] Coordinated maintenance in a multi-component system with compound Poisson deterioration
    Rombouts, Pim
    Ramirez, Stefanny
    Bauso, Dario
    NONLINEAR ANALYSIS-HYBRID SYSTEMS, 2022, 44
  • [44] Coordinated maintenance in a multi-component system with compound Poisson deterioration
    Rombouts, Pim
    Ramirez, Stefanny
    Bauso, Dario
    Nonlinear Analysis: Hybrid Systems, 2022, 44
  • [45] A two dissimilar unit multi-component system with correlated failures and repairs
    Gupta, R
    Mumtaz, SZ
    Goel, R
    MICROELECTRONICS AND RELIABILITY, 1997, 37 (05): : 845 - 849
  • [46] Strategy Optimization of Multi-Component System Opportunity Maintenance for Electric Multiple Units From a Lean Maintenance Perspective
    Li, Jing
    Wang, Hong
    Xiong, Lu
    He, Yong
    Yi, Chengshan
    IEEE ACCESS, 2023, 11 : 89478 - 89487
  • [47] Preventive maintenance modeling for multi-component systems with considering stochastic failures and disassembly sequence
    Zhou, Xiaojun
    Huang, Kaimin
    Xi, Lifeng
    Lee, Jay
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2015, 142 : 231 - 237
  • [48] Maintenance Planning Based on Reliability Assessment of Multi-state Multi-component System
    Jain, N.
    Rathore, A. P. S.
    Jain, R.
    Yadav, O. P.
    2018 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2018, : 262 - 267
  • [49] Optimisation of opportunistic maintenance of a multi-component system considering the effect of failures on quality and production schedule: A case study
    Pravin P. Tambe
    Satish Mohite
    Makarand S. Kulkarni
    The International Journal of Advanced Manufacturing Technology, 2013, 69 : 1743 - 1756
  • [50] Optimisation of opportunistic maintenance of a multi-component system considering the effect of failures on quality and production schedule: A case study
    Tambe, Pravin P.
    Mohite, Satish
    Kulkarni, Makarand S.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 69 (5-8): : 1743 - 1756