Simple heuristic to minimize total tardiness in a single machine scheduling problem

被引:0
|
作者
R. Panneerselvam
机构
[1] Pondicherry University,Department of Management Studies, School of Management
来源
The International Journal of Advanced Manufacturing Technology | 2006年 / 30卷
关键词
Simple heuristic; Total tardiness;
D O I
暂无
中图分类号
学科分类号
摘要
This paper discusses a simple heuristic to minimize the total tardiness in a single machine scheduling problem. The problem of minimizing total tardiness in single machine scheduling is a combinatorial problem. Hence, heuristic development for such problems is inevitable. In this paper, an attempt has been made to develop a simple heuristic, alternatively called greedy heuristic, to minimize the total tardiness in a single machine scheduling problem with n independent jobs, each having its processing time and due date. Further, its solution accuracy is compared with the optimal solution of a set of randomly generated problems using an ANOVA experiment. From the ANOVA experiment, it is observed that the solution of the simple heuristic proposed in this paper does not differ significantly from the optimal solution at a significance level of 0.05.
引用
收藏
页码:722 / 726
页数:4
相关论文
共 50 条
  • [21] Single machine scheduling with controllable processing times to minimize total tardiness and earliness
    Kayvanfar, Vahid
    Mahdavi, Iraj
    Komaki, Gh. M.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 65 (01) : 166 - 175
  • [22] Scheduling A Single Machine With Job Family Setup Times To Minimize Total Tardiness
    Abdallah, Khaled S.
    Jang, Jaejin
    2017 INTERNATIONAL CONFERENCE ON ENGINEERING, TECHNOLOGY AND INNOVATION (ICE/ITMC), 2017, : 665 - 672
  • [23] Batch scheduling with learning effect on single-machine to minimize the total tardiness
    Hu J.-C.
    Wu Y.-H.
    Wu Y.-Y.
    Yang D.
    Kongzhi yu Juece/Control and Decision, 2019, 34 (12): : 2708 - 2712
  • [24] A memetic algorithm for the total tardiness single machine scheduling problem
    França, PM
    Mendes, A
    Moscato, P
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2001, 132 (01) : 224 - 242
  • [25] A HEURISTIC ALGORITHM FOR SEQUENCING ON ONE MACHINE TO MINIMIZE TOTAL TARDINESS
    HOLSENBACK, JE
    RUSSELL, RM
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1992, 43 (01) : 53 - 62
  • [26] Minimize total tardiness and machine unavailability on single machine scheduling problem: bi-objective branch and bound algorithm
    Khoudi, Asmaa
    Berrichi, Ali
    OPERATIONAL RESEARCH, 2020, 20 (03) : 1763 - 1789
  • [27] Heuristic algorithms to minimize the total tardiness in a flow shop production and outbound distribution scheduling problem
    Quang Chieu Ta
    Billaut, Jean-Charles
    Bouquard, Jean-Louis
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 128 - 134
  • [28] Minimize total tardiness and machine unavailability on single machine scheduling problem: bi-objective branch and bound algorithm
    Asmaa Khoudi
    Ali Berrichi
    Operational Research, 2020, 20 : 1763 - 1789
  • [29] Data Mining Approaches for the Methods to Minimize Total Tardiness in Parallel Machine Scheduling Problem
    Senvar, Ozlem
    Yalaoui, Farouk
    Dugardin, Frederic
    Lara, Andres Felipe Bernate
    IFAC PAPERSONLINE, 2016, 49 (12): : 431 - 436
  • [30] Scheduling rules to minimize total tardiness in a parallel machine problem with setup and calendar constraints
    Lamothe, Jacques
    Marmier, Francois
    Dupuy, Matthieu
    Gaborit, Paul
    Dupont, Lionel
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (06) : 1236 - 1244