Train operation adjustment based on conflict resolution for high-speed rail

被引:1
|
作者
Wen C. [1 ,2 ]
Li B. [1 ]
机构
[1] School of Transportation and Logistics, Southwest Jiaotong University, Chengdu, Sichuan
[2] Key Laboratory of Comprehensive Transportation of Sichuan Province, Chengdu, Sichuan
关键词
Conflict resolution cost; High-speed rail; Train operation adjustment; Train operation conflict;
D O I
10.1007/s12198-012-0104-9
中图分类号
学科分类号
摘要
In order to study the issue of train operation adjustment of high-speed rail, the method of train operation adjustment based on conflict resolution is proposed. The procedure of train operation adjustment is divided into two steps, namely train paths self-recovery and train operation conflicts resolution. The characteristics of train operation conflicts resolution such as rigid constraints, dynamic and real-time, and combinatorial optimization are analyzed. Based on the analysis of the functions of the time costs and the after-effects of the conflict resolution, the calculation of conflict resolution cost for high-speed rail is studied. The procedure of train operation conflicts resolution and train operation adjustment based on conflict resolution for high-speed rail are given. © 2013 Springer Science+Business Media New York.
引用
收藏
页码:77 / 87
页数:10
相关论文
共 50 条
  • [41] The calculation of train slipstreams on platform of underground high-speed rail station
    Yang, Wei-Chao
    He, Chuan
    Peng, Li-Min
    MATERIALS, MECHANICAL AND MANUFACTURING ENGINEERING, 2014, 842 : 445 - +
  • [42] DESIGN AND MANUFACTURE OF THE BRITISH-RAIL HIGH-SPEED TRAIN CAB
    GOTCH, TM
    PLASTICS & RUBBER INTERNATIONAL, 1979, 4 (03): : 119 - 124
  • [43] Waiting for the Train: Territorial Productivity and the High-speed Rail Project in Mexico
    Fernandez, Jose Antonio Guerrero
    Kato-Vidal, Enrique Leonardo
    ECONOMIA SOCIEDAD Y TERRITORIO, 2022, 22 (68): : 147 - 176
  • [44] Modeling and simulation of high-speed passenger train movements in the rail line
    Cao Cheng-Xuan
    Xu Yan
    Li Ke-Ping
    CHINESE PHYSICS B, 2013, 22 (06)
  • [45] DYNAMIC INTERACTION BETWEEN RAIL VEHICLES AND TRACK FOR HIGH-SPEED TRAIN
    DIANA, G
    CHELI, F
    BRUNI, S
    COLLINA, A
    VEHICLE SYSTEM DYNAMICS, 1995, 24 : 15 - 30
  • [46] Train-mounted GPR for high-speed rail trackbed inspection
    Al-Nuaimy, W
    Eriksen, A
    Gasgoyne, J
    PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON GROUND PENETRATING RADAR, VOLS 1 AND 2, 2004, : 631 - 634
  • [47] Modeling and simulation of high-speed passenger train movements in the rail line
    曹成铉
    许琰
    李克平
    Chinese Physics B, 2013, 22 (06) : 243 - 249
  • [48] Optimization and Simulation Research on the High-Speed Rail Train Tracking Interval
    Yan, Dawu
    Wang, Chaoyu
    PROCEEDINGS OF THE SIXTH INTERNATIONAL CONFERENCE ON TRANSPORTATION ENGINEERING (ICTE 2019), 2019, : 1054 - 1062
  • [49] Train Operation Adjustment of the Urban Rail Transit based on Dwell Time Model
    Dong, Hairong
    Liu, Jiazheng
    Chen, Yao
    Sun, Xubin
    2014 IEEE 17TH INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION SYSTEMS (ITSC), 2014, : 2422 - 2427
  • [50] An Optimal Operation Planning Model for High-Speed Rail Transportation
    Xiaoqiang Zhang
    Lin Li
    Muhammad Afzal
    International Journal of Civil Engineering, 2019, 17 : 1397 - 1407