共 50 条
- [33] Climate-induced hydrological impacts on the groundwater system of the Pingtung Plain, Taiwan [J]. Hydrogeology Journal, 2007, 15 : 903 - 913
- [34] Estimation of groundwater recharge in North China Plain [J]. Shuikexue Jinzhan/Advances in Water Science, 2013, 24 (01): : 73 - 81
- [36] Feasible groundwater allocation scenarios for land subsidence area of Pingtung Plain, Taiwan [J]. Water Resources, 2007, 34 : 259 - 267
- [37] To Study Hydrological Variabilities by using Surface and Groundwater Coupled Model - A Case Study of PingTung Plain, Taiwan [J]. 12TH INTERNATIONAL CONFERENCE ON HYDROINFORMATICS (HIC 2016) - SMART WATER FOR THE FUTURE, 2016, 154 : 1034 - 1042
- [39] Estimation of groundwater recharge using various methods in Neishaboor Plain, Iran [J]. GROUNDWATER MODELING AND MANAGEMENT UNDER UNCERTAINTY, 2012, : 9 - 15
- [40] Groundwater recharge estimation using chloride mass balance: a case study of Nsukka local government area of Enugu State, Southeastern, Nigeria [J]. Modeling Earth Systems and Environment, 2020, 6 : 799 - 810