Supporting optimization of thick seam roadway with top coal based on orthogonal matrix analysis

被引:0
|
作者
Ce Jia
Sheng Li
Chaojun Fan
Mingkun Luo
Lijun Zhou
Ziang Pu
Lei Yang
机构
[1] Liaoning Technical University,College of Mining
[2] Shanxi Lu’an Chemical (Group) Co.,Zhangcun Coal Mine
[3] Ltd.,College of Safety Science and Engineering
[4] Liaoning Technical University,undefined
来源
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Aiming at the problem of large deformation and difficulty in surrounding rock control of the top coal roadway in thick seam, theoretical analysis, theoretical analysis, numerical simulation, orthogonal matrix analysis and other methods were used to study the roof deformation and support parameter optimization of the top coal roadway in thick seam. Firstly, the structural model and roof mechanical model of the top coal roadway in thick seam were established, and the deformation coefficient TK was defined based on the relationship between curvature radius and bending moment, maximum bending moment and ultimate tensile strength of beam. According to the ratio of deformation rate between TK and beam to determine the roof deformation mode of top coal roadway, the discriminant conditions of roadway roof stability under two deformation conditions are obtained. Due to the characteristics of serious coal-rock fragmentation, large roof deformation, and integration of top coal and side coal. Therefore, the combined support method of “high prestressed long and short anchor cables” is proposed by double arch bearing structure control technology. Finally, based on the orthogonal matrix analysis method of supporting parameters optimization of the top coal roadway in thick seam, the analysis amount of supporting scheme is significantly reduced, the comprehensive evaluation of multi-factor and multi-supporting effect of roadway support is realized, and the optimal supporting scheme is obtained. Compared with the surrounding rock of the roadway without support, the deformation of the roof is reduced by 27.27%, the deformation of the two sides is reduced by 45.24%, and the tensile failure volume is reduced by 54.66%. The top coal roadway in thick seam has been effectively controlled, which provides guarantee for high yield and high efficiency of the mine.
引用
收藏
相关论文
共 50 条
  • [21] Analysis of Failure Mechanism of Roadway Surrounding Rock under Thick Coal Seam Strong Mining Disturbance
    Qi, Fuzhou
    Yang, Dangwei
    Zhang, Yuguo
    Hao, Yuxi
    SHOCK AND VIBRATION, 2021, 2021
  • [22] Roadway Supporting Technology in Fully Mechanized Workface with Large Mining Height of Specially Thick Coal Seam in Datong Mining Area
    Lu, Guoliang
    Wang, Chen
    Jiang, Yaodong
    Wang, Hongwei
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 1611 - 1616
  • [23] Analysis of Surrounding Rock Control Technology and Its Application on a Dynamic Pressure Roadway in a Thick Coal Seam
    Hao, Jian
    Chen, Anfa
    Li, Xuelong
    Bian, Hua
    Zhou, Guanghua
    Wu, Zhenguo
    Peng, Linjun
    Tang, Jianquan
    ENERGIES, 2022, 15 (23)
  • [24] Supporting stress field with different cable length in deep roadway with thick top-coal-a case study at tangkou coal mine
    Zhen, Wang (mewangzhen@cumt.edu.cn), 1600, E-Journal of Geotechnical Engineering (21):
  • [25] Determination of filling strength of high foam material at the top of ultra-high roadway in extremely soft thick coal seam
    Wang X.
    Jia J.
    Yang Z.
    Zhao W.
    Wang J.
    Yang P.
    Yang Q.
    Journal of Mining and Strata Control Engineering, 2023, 5 (04)
  • [26] Coal Seam Roadway Bolt Support Design Method Based on the Supporting Theory of Broken Rock Zone
    Liu Haiyuan
    Wang Zhigang
    Li Ji
    Bai Lang
    RESOURCES AND SUSTAINABLE DEVELOPMENT, PTS 1-4, 2013, 734-737 : 535 - 539
  • [27] Longwall Top-Coal Caving Mechanism and Cavability Optimization with Hydraulic Fracturing in Thick Coal Seam: A Case Study
    Wang, Zhaohui
    Tang, Yuesong
    Gong, Hao
    ENERGIES, 2021, 14 (16)
  • [29] Optimization of supporting plans for the quick-return tunnel in an extremely thick and fracture developing coal Seam
    Zhao, Guozhen
    Ma, Zhanguo
    Zhang, Ruichong
    Lu, Zhaoxu
    Electronic Journal of Geotechnical Engineering, 2014, 19 A : 175 - 184
  • [30] Roadway layout for recycling residual coal pillar in room-and-pillar mining of thick coal seam
    Jin Gan
    Wang Lianguo
    Zhang Jihua
    Hu Minjun
    Duan Ning
    InternationalJournalofMiningScienceandTechnology, 2015, 25 (05) : 729 - 734