New Grid Scheduling and Rescheduling Methods in the GrADS Project

被引:0
|
作者
F. Berman
H. Casanova
A Chien
K. Cooper
H. Dail
A. Dasgupta
W. Deng
J. Dongarra
L. Johnsson
K. Kennedy
C. Koelbel
B. Liu
X. Liu
A. Mandal
G. Marin
M. Mazina
J. Mellor-Crummey
C. Mendes
A. Olugbile
M. Patel
D. Reed
Z. Shi
O. Sievert
H. Xia
A. YarKhan
机构
[1] University of California at San Diego,Department of Computer Science and Engineering
[2] Rice University,Computer Science Dept.
[3] University of Illinois,Department Computer Science
[4] University of Tennessee,Innovative Computing Lab
[5] University of Houston,Department Computer Science
[6] University of North Carolina at Chapel Hill,Renaissance Computing Institute
关键词
Grid computing; scheduling; rescheduling;
D O I
暂无
中图分类号
学科分类号
摘要
The goal of the Grid Application Development Software (GrADS) Project is to provide programming tools and an execution environment to ease program development for the Grid. This paper presents recent extensions to the GrADS software framework: a new approach to scheduling workflow computations, applied to a 3-D image reconstruction application; a simple stop/migrate/restart approach to rescheduling Grid applications, applied to a QR factorization benchmark; and a process-swapping approach to rescheduling, applied to an N-body simulation. Experiments validating these methods were carried out on both the GrADS MacroGrid (a small but functional Grid) and the MicroGrid (a controlled emulation of the Grid).
引用
收藏
页码:209 / 229
页数:20
相关论文
共 50 条
  • [21] NEW DIRECTIONS FOR RECENT GRADS
    ZIPKOWITZ, F
    LIBRARY JOURNAL, 1995, 120 (17) : 26 - &
  • [22] BRIGHT 1969 FOR NEW GRADS
    不详
    CHEMICAL ENGINEERING PROGRESS, 1969, 65 (03) : 19 - &
  • [23] Productivity scheduling method compared to linear and repetitive project scheduling methods
    Lucko, Gunnar
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (09) : 711 - 720
  • [24] Computational models and heuristic methods for Grid scheduling problems
    Xhafa, Fatos
    Abraham, Ajith
    FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE, 2010, 26 (04): : 608 - 621
  • [25] Bridge the gap for new grads
    Opperman, M
    VETERINARY ECONOMICS, 2005, 46 (12): : 24 - +
  • [26] Production not for new grads - Reponse
    Opperman, M
    VETERINARY ECONOMICS, 2006, 47 (05): : 10 - 10
  • [27] Software Project Rescheduling with Genetic Algorithms
    Ge, Yujia
    2009 INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND COMPUTATIONAL INTELLIGENCE, VOL I, PROCEEDINGS, 2009, : 439 - 443
  • [28] Nursing rescheduling problem with multiple rescheduling methods under uncertainty
    Long, Zhiren
    Wen, Xianxiu
    Lan, Mei
    Yang, Yongjian
    COMPLEX & INTELLIGENT SYSTEMS, 2022, 8 (06) : 4557 - 4569
  • [29] Nursing rescheduling problem with multiple rescheduling methods under uncertainty
    Zhiren Long
    Xianxiu Wen
    Mei Lan
    Yongjian Yang
    Complex & Intelligent Systems, 2022, 8 : 4557 - 4569
  • [30] Practical CPD for new grads
    不详
    VETERINARY RECORD, 2016, 179 (10) : 242 - 242