Multiple-order permutation flow shop scheduling under process interruptions

被引:0
|
作者
Humyun Fuad Rahman
Ruhul Sarker
Daryl Essam
机构
[1] Aalborg University,Department of Mechanical and Manufacturing Engineering
[2] UNSW,School of Engineering and Information Technology
来源
The International Journal of Advanced Manufacturing Technology | 2018年 / 97卷
关键词
Manufacturing; Disruptions; Order acceptance and scheduling; Permutation flow shop scheduling; Genetic algorithm; Memetic algorithm;
D O I
暂无
中图分类号
学科分类号
摘要
The permutation flow shop problem is a complex combinatorial optimization problem. Over the last few decades, a good number of algorithms have been proposed to solve static permutation flow shop problems. However, in practice, permutation flow shop problems are not static but rather are dynamic because the orders (where each order contains multiple jobs) arrive randomly for processing and the operation of any job may be interrupted due to resource problems. For any interruption, it is necessary to reschedule the existing jobs that are under process at different stages in the production system and also any orders that were previously accepted that are waiting for processing. In this paper, a memetic algorithm-based rescheduling approach has been proposed to deal with both single and multiple orders while considering random interruptions of resources. The experimental results have shown that the performance of the proposed approach is superior to traditional reactive approaches.
引用
收藏
页码:2781 / 2808
页数:27
相关论文
共 50 条
  • [21] A Reinforcement Learning Approach to Robust Scheduling of Permutation Flow Shop
    Zhou, Tao
    Luo, Liang
    Ji, Shengchen
    He, Yuanxin
    BIOMIMETICS, 2023, 8 (06)
  • [22] EFFICIENT ALGORITHM FOR LOT PERMUTATION FLOW SHOP SCHEDULING PROBLEM
    Dodu, Cristina Elena
    Ancau, Mircea
    PROCEEDINGS OF THE ROMANIAN ACADEMY SERIES A-MATHEMATICS PHYSICS TECHNICAL SCIENCES INFORMATION SCIENCE, 2021, 22 (03): : 231 - 238
  • [23] Hybrid particle swarm optimization for permutation flow shop scheduling
    Liu, Zhixiong
    Wang, Shaomei
    WCICA 2006: SIXTH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-12, CONFERENCE PROCEEDINGS, 2006, : 3245 - +
  • [24] A hybrid EDA with ACS for solving permutation flow shop scheduling
    Yeu-Ruey Tzeng
    Chun-Lung Chen
    Chuen-Lung Chen
    The International Journal of Advanced Manufacturing Technology, 2012, 60 : 1139 - 1147
  • [25] An Improved Multiobjective Memetic Algorithm for Permutation Flow Shop Scheduling
    Chiang, Tsung-Che
    Fu, Li-Chen
    2010 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2010,
  • [26] Operations Scheduling in Permutation Flow Shop Systems: a Bibliometric Contribution
    Endler, K. D.
    Steiner, M. T. A.
    Scarpin, C. T.
    Souza, P. L. B. D.
    IEEE LATIN AMERICA TRANSACTIONS, 2015, 13 (12) : 3966 - 3973
  • [27] Deployment of Solving Permutation Flow Shop Scheduling Problem on the Grid
    Kouki, Samia
    Jemni, Mohamed
    Ladhari, Talel
    GRID AND DISTRIBUTED COMPUTING, CONTROL AND AUTOMATION, 2010, 121 : 95 - +
  • [28] A New Robust Scheduling Model for Permutation Flow Shop Problem
    Liao, Wenzhu
    Fu, Yanxiang
    RECENT ADVANCES IN INTELLIGENT MANUFACTURING, PT I, 2018, 923 : 308 - 317
  • [29] A linear time approximation algorithm for permutation flow shop scheduling
    Poggi, Marcus
    Sotelo, David
    THEORETICAL COMPUTER SCIENCE, 2012, 416 : 87 - 94
  • [30] A hybrid EDA with ACS for solving permutation flow shop scheduling
    Tzeng, Yeu-Ruey
    Chen, Chun-Lung
    Chen, Chuen-Lung
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 60 (9-12): : 1139 - 1147