Backward simulation in food industry for facility planning and daily scheduling

被引:0
|
作者
Graupner, TD [1 ]
Bornhäuser, M [1 ]
Sihn, W [1 ]
机构
[1] Fraunhofer Inst Mfg Engn & Automat IPA, D-70569 Stuttgart, Germany
来源
SIMULATION IN INDUSTRY | 2004年
关键词
(Backward) simulation; food; facility planning; capacity planning; daily scheduling;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
in the light of high capital expenditure for manufacturing facilites in food and process industry, an increasing number of variants and frequenthy changing sales developments, simulation models are becoming more and more important for the support of capacity and production planning. In the following, the use of a simulation toolset for the support of tactical capacity planning and operative production planning is presented. It was implemented in cooperation with a global player of food industry. The challenge of the project was the implementation of a backward simulation. Instead of filling food from a tank into cups, the computer simulates the process inversely. The advantage of the chosen procedure is that the provision of all components of a dessert or yogurt product at the time of filling as well as an efficient utilization of resources is ensured.
引用
收藏
页码:47 / 52
页数:6
相关论文
共 50 条
  • [21] Production planning, scheduling and control in industry
    Nogueira, Nelrian de Brito
    Roberto, Jose Carlos Alves
    Souto, Sistina Pereira
    de Lima, Orlem Pinheiro
    de Araujo, Paulo Cesar Diniz
    REVISTA DE GESTAO E SECRETARIADO-GESEC, 2023, 14 (06): : 8647 - 8670
  • [22] Production planning in the food industry
    Rolstadas, A
    PRODUCTION PLANNING & CONTROL, 1998, 9 (04) : 319 - 319
  • [23] % Daily Intake embraced by food industry
    不详
    FOOD AUSTRALIA, 2007, 59 (04): : 159 - 159
  • [24] A COMPUTERIZED FACILITY PLANNING SYSTEM FOR THE OIL INDUSTRY
    MORTAGY, AK
    ABULLEIL, A
    COMPUTERS & INDUSTRIAL ENGINEERING, 1980, 4 (03) : 155 - 160
  • [25] Facility Layout Planning of Central Kitchen in Food Service Industry: Application to the Real-Scale Problem
    Fujii, Nobutada
    Kaihara, Toshiya
    Uemura, Minami
    Nonaka, Tomomi
    Shimmura, Takeshi
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS, APMS 2013, PT II, 2013, 415 : 33 - 40
  • [26] The role of simulation in advanced planning and scheduling
    Musselman, K
    O'Reilly, J
    Duket, S
    PROCEEDINGS OF THE 2002 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2002, : 1825 - 1830
  • [27] Scheduling and simulation systems in the process industry
    Heydecke, J
    Kovriguin, OV
    CHEMIE INGENIEUR TECHNIK, 1996, 68 (10) : 1272 - 1278
  • [28] Joint financial and operating scheduling/planning in industry
    Badell, M
    Romero, J
    Puigjaner, L
    EUROPEAN SYMPOSIUM ON COMPUTER-AIDED PROCESS ENGINEERING - 14, 2004, 18 : 883 - 888
  • [29] Multiscale planning and scheduling in the secondary pharmaceutical industry
    Stefansson, Hlynur
    Shah, Nilay
    Jensson, Pall
    AICHE JOURNAL, 2006, 52 (12) : 4133 - 4149
  • [30] SIMULATION MODEL FOR VOCATIONAL EDUCATIONAL FACILITY PLANNING
    CARTER, DA
    COLKER, A
    LEIB, J
    JOURNAL OF INDUSTRIAL ENGINEERING, 1968, 19 (02): : 68 - &