Feasibility study; MAPRAM method; Risk analysis; Foundation; Power transmission lines; PROGRAMMATIC RISK ANALYSIS; MANAGEMENT; PROJECT; SYSTEMS;
D O I
10.1007/s43452-021-00197-4
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Civil engineering projects deal with different risks over their life-cycle. Generally, risk sources are categorized into three types of cost, time, and project quality. The Modified Advanced Programmatic Risk Analysis Model (MAPRAM) is one of the leading approaches in this field that can assess the risks of the project on its whole life cycle. Electricity transmission lines have always been one of the most costly and time-consuming infrastructure projects. The costs of these projects play a significant role in a country's development budget. Given the considerable time and cost of constructing the foundations for power transmission towers, providing an economical design will significantly help in reducing duration and budget of these projects. In this study, using MAPRAM, first, different types of foundations of power transmission lines were studied; then the optimal foundations were introduced for a specific place as a case study, shaping a general framework to appoint the optimal foundation for power transmission lines in different areas. The foundations studied in this study included: pad & chimney foundation, auger foundation, steel grillage foundation, concrete piles, and helical piles. Initially, different types of foundations were designed, and then, the costs of each foundation in a whole life-cycle were estimated. Next, the risks and probability of their occurrence were identified for each type of foundation. Finally, the appropriate foundation was determined for the studied soil samples by performing an optimization process.
引用
收藏
页数:15
相关论文
共 50 条
  • [41] Experience in the prevention of frost heave of pile foundations of transmission towers under northern conditions
    Lyazgin A.L.
    Lyashenko V.S.
    Ostroborodov S.V.
    Ol'shanskii V.G.
    Bayasan R.M.
    Shevtsov K.P.
    Pustovoit G.P.
    [J]. Power Technology and Engineering, 2004, 38 (2) : 124 - 126
  • [42] Calibration of the Resistance Factors for the LRFD of Shallow Foundations of Transmission Towers under Uplift Loading
    Han, Jayne M.
    Gu, Kyo-Young
    Kim, Kyeong-Sun
    Ham, Kyung-Won
    Kim, Sung-Ryul
    [J]. INTERNATIONAL JOURNAL OF GEOMECHANICS, 2024, 24 (08)
  • [43] Power Supply System of High-voltage Towers Based on Multi-core Energy Transmission Fiber
    Cheng, Lin
    Jiang, Yi
    Liu, Zhengyang
    Gao, Qiang
    [J]. 2019 18TH INTERNATIONAL CONFERENCE ON OPTICAL COMMUNICATIONS AND NETWORKS (ICOCN), 2019,
  • [44] Analysis of Electromagnetic Radiation of Mobile Base Stations Co-located with High-Voltage Transmission Towers
    Yang, Zhichao
    Dang, Dong
    Cheng, Xu
    Mo, Juan
    Zhou, Xiaoyu
    Fang, Yuqun
    Peng, Yong
    [J]. SYMMETRY-BASEL, 2023, 15 (06):
  • [45] A study on weathering steel bolts for transmission towers
    Zeng, Shangwu
    Xu, Delu
    Li, Daijun
    Li, Guang
    Chang, Jianwei
    Fu, Chao
    [J]. JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2020, 174
  • [46] Electrical Resistivity Tomography study above inaccessible old mine workings for safe erection of high voltage electricity power transmission terrestrial towers: a case study
    Bharti, Abhay Kumar
    Prakash, Amar
    Oraon, Sandip
    Jaiswal, Prerna
    Mandal, Sujit Kumar
    [J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2024, 83 (10)
  • [47] Construction of high performance equipment foundations
    Septelka, DM
    Cooper, JA
    [J]. CONSTRUCTION CONGRESS VI, PROCEEDING: BUILDING TOGETHER FOR A BETTER TOMORROW IN AN INCREASINGLY COMPLEX WORLD, 2000, : 768 - 777
  • [48] Feasibility study of Energy Towers via CFD analysis
    Moses, EJ
    Toren, M
    Olek, S
    [J]. HEAT TRANSFER 1998, VOL 5: GENERAL PAPERS, 1998, : 223 - 228
  • [49] Power current capacitors in object construction methods for high operational voltage.
    Rambold, W
    [J]. ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1938, 82 : 813 - 814
  • [50] Reliability analysis of bearing-capacity of tower foundations designed for ultra high voltage transmission lines
    Zhang, Zifu
    Yang, Wenzhi
    Zhu, Haitao
    [J]. Tianjin Daxue Xuebao (Ziran Kexue yu Gongcheng Jishu Ban)/Journal of Tianjin University Science and Technology, 2015, 48 : 142 - 146