共 50 条
- [41] The Cost Risk Management and Control Of Construction Project PROCEEDINGS OF THE 16TH INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE (CRIOCM2011), 2011, : 287 - 292
- [42] Cost/Schedule Monitoring and Forecasting for Project Based on Earned Value Management (EVM) ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 1437 - +
- [44] Research on Optimization of Schedule-Cost Risk for R&D Project PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 284 - 289
- [46] Telecommunications Project Management - A Holistic Approach for Operations-Related Services IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 1043 - +
- [47] A Holistic Approach for IoT Networks' Identity and Trust Management - The ERATOSTHENES Project INTERNET OF THINGS, GIOTS 2022, 2022, 13533 : 338 - 347
- [48] A systems approach to project risk management PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL I AND II, PROCEEDINGS, 2002, : 1489 - 1494
- [49] An extended approach for project risk management SOR'07: PROCEEDINGS OF THE 9TH INTERNATIONAL SYMPOSIUM ON OPERATIONAL RESEARCH IN SLOVENIA, 2007, : 357 - +
- [50] Project risk management: A new approach 2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 839 - 843