Holistic Risk Management Approach for Predicting Cost and Schedule Overruns at Project Completion

被引:0
|
作者
Assaad, Rayan [1 ]
El-Adaway, Islam [2 ,3 ,4 ,5 ]
Abotaleb, Ibrahim [1 ]
机构
[1] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, Rolla, MO 65409 USA
[2] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, Construct Engn & Management, Rolla, MO 65409 USA
[3] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, Civil Engn & Founding, Rolla, MO 65409 USA
[4] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, Missouri Consortium Construct Innovat, Rolla, MO 65409 USA
[5] Missouri Univ Sci & Technol, Dept Engn Management & Syst Engn, Rolla, MO 65409 USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Risk management (RM) technique concentrates on the unknown future performance of projects to determine risks, and it suggests early corrective actions to reduce the impacts of the identified risks. Irrespective of the project properties, cost and schedule growths are substantially experienced in construction projects. Some research works developed models without incorporating any direct relation between different project parameters and the project performance. Moreover, other research studies utilized inputs that fall short in covering the varied risks present in construction projects. To this end, no research study is perceived to have established an integrated methodology to predict the performance of construction projects. As such, this paper presents a holistic RM model to predict the project performance by incorporating a wide spectrum of inputs. The paper relies on 25 parameters that are believed to be the most prominent variables affecting the performance of construction projects. These variables were incorporated into a survey to study their effects on project performance. The collected data was used to fit statistical distributions for each parameter. Based on a mapping between the fitted distributions of the 25 parameters and those of the cost and schedule overruns, this research work was able to propose a new RM model that is easily used to predict project performance in terms of cost and time. This research is valuable for the construction industry as it allows decision makers to take corrective actions as well as assessing the impact of such actions on the future performance of projects. Ultimately, project administrators will be able to predict the overall cost and schedule overruns based on various project parameters. This helps in taking the appropriate actions and decisions to ensure smooth delivery and execution of projects.
引用
下载
收藏
页码:583 / 592
页数:10
相关论文
共 50 条
  • [41] The Cost Risk Management and Control Of Construction Project
    Ye, Xiaoling
    PROCEEDINGS OF THE 16TH INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE (CRIOCM2011), 2011, : 287 - 292
  • [42] Cost/Schedule Monitoring and Forecasting for Project Based on Earned Value Management (EVM)
    Huang, Jianwen
    Pan, Huimin
    Li, Yan
    Zhu, Yiting
    Liao, Zaiyi
    ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 1437 - +
  • [43] Design of Construction project schedule optimization system based on cost optimization and management
    Yuan X.
    Journal of Commercial Biotechnology, 2022, 27 (01) : 64 - 75
  • [44] Research on Optimization of Schedule-Cost Risk for R&D Project
    Li, Ping
    Ma, Chao
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 284 - 289
  • [45] Balancing Project Schedule, Cost, and Value under Uncertainty: A Reinforcement Learning Approach
    Szwarcfiter, Claudio
    Herer, Yale T.
    Shtub, Avraham
    ALGORITHMS, 2023, 16 (08)
  • [46] Telecommunications Project Management - A Holistic Approach for Operations-Related Services
    Frisanco, Thomas
    Anglberger, Norbert
    Ang, Rachel
    Onu, Stephen
    IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 1043 - +
  • [47] A Holistic Approach for IoT Networks' Identity and Trust Management - The ERATOSTHENES Project
    Loupos, Konstantinos
    Kalogirou, Christos
    Niavis, Harris
    Skarmeta, Antonio
    Torroglosa-Garcia, Elena
    Palomares, Angel
    Song, Hui
    Brun, Paul-Emmanuel
    Giampaolo, Francesca
    Van Landuyt, Dimitri
    Michiels, Sam
    Podgorelec, Blaz
    Xenakis, Christos
    Bampatsikos, Michail
    Krilakis, Konstantinos
    INTERNET OF THINGS, GIOTS 2022, 2022, 13533 : 338 - 347
  • [48] A systems approach to project risk management
    Kindinger, JP
    PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL I AND II, PROCEEDINGS, 2002, : 1489 - 1494
  • [49] An extended approach for project risk management
    Kusar, Janez
    Bradesko, Lidija
    Lenart, Lado
    Starbek, Marko
    SOR'07: PROCEEDINGS OF THE 9TH INTERNATIONAL SYMPOSIUM ON OPERATIONAL RESEARCH IN SLOVENIA, 2007, : 357 - +
  • [50] Project risk management: A new approach
    Creemers, S.
    Demeulemeester, E.
    Van de Vonder, S.
    2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 839 - 843