Holistic Risk Management Approach for Predicting Cost and Schedule Overruns at Project Completion

被引:0
|
作者
Assaad, Rayan [1 ]
El-Adaway, Islam [2 ,3 ,4 ,5 ]
Abotaleb, Ibrahim [1 ]
机构
[1] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, Rolla, MO 65409 USA
[2] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, Construct Engn & Management, Rolla, MO 65409 USA
[3] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, Civil Engn & Founding, Rolla, MO 65409 USA
[4] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, Missouri Consortium Construct Innovat, Rolla, MO 65409 USA
[5] Missouri Univ Sci & Technol, Dept Engn Management & Syst Engn, Rolla, MO 65409 USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Risk management (RM) technique concentrates on the unknown future performance of projects to determine risks, and it suggests early corrective actions to reduce the impacts of the identified risks. Irrespective of the project properties, cost and schedule growths are substantially experienced in construction projects. Some research works developed models without incorporating any direct relation between different project parameters and the project performance. Moreover, other research studies utilized inputs that fall short in covering the varied risks present in construction projects. To this end, no research study is perceived to have established an integrated methodology to predict the performance of construction projects. As such, this paper presents a holistic RM model to predict the project performance by incorporating a wide spectrum of inputs. The paper relies on 25 parameters that are believed to be the most prominent variables affecting the performance of construction projects. These variables were incorporated into a survey to study their effects on project performance. The collected data was used to fit statistical distributions for each parameter. Based on a mapping between the fitted distributions of the 25 parameters and those of the cost and schedule overruns, this research work was able to propose a new RM model that is easily used to predict project performance in terms of cost and time. This research is valuable for the construction industry as it allows decision makers to take corrective actions as well as assessing the impact of such actions on the future performance of projects. Ultimately, project administrators will be able to predict the overall cost and schedule overruns based on various project parameters. This helps in taking the appropriate actions and decisions to ensure smooth delivery and execution of projects.
引用
收藏
页码:583 / 592
页数:10
相关论文
共 50 条
  • [1] An Auction Approach for Cost and Schedule Management of IT Outsourcing Project
    Lu, Fuqiang
    Hu, Yanli
    Bi, Hualing
    Huang, Min
    Zhao, Meng
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2018, 35 (05)
  • [2] The study on the predicting methods of completion cost based on schedule variance
    Yu, Xiaozhong
    Wan, Ling
    [J]. PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2009, : 177 - 181
  • [3] A holistic approach for understanding Project management
    Kraft, Theresa A.
    Steenkamp, Annette L.
    [J]. INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGIES AND SYSTEMS APPROACH, 2010, 3 (02) : 17 - 31
  • [4] Combination of Growth Model and Earned Schedule to Forecast Project Cost at Completion
    Narbaev, Timur
    De Marco, Alberto
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (01)
  • [5] Research on Risk Management of Project Schedule
    Liu, Jinling
    [J]. KNOWLEDGE DISCOVERY AND DATA MINING, 2012, 135 : 397 - 404
  • [6] Integration of technical, cost, and schedule risks in project management
    [J]. Riggs, Jeffrey L., 1600, Publ by Pergamon Press Inc, Tarrytown, NY, United States (21):
  • [7] Influence of cost contingency management on project estimates at completion
    De Marco, Alberto
    Narbaev, Timur
    Ottaviani, Filippo Maria
    Vanhoucke, Mario
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (09) : 935 - 945
  • [8] Convergence: A holistic approach to risk management
    Anderson, Kent
    [J]. Network Security, 2007, 2007 (05) : 4 - 7
  • [9] Predicting maintenance cost overruns in public school buildings using a rough topological approach
    Kazar, Gökhan
    Yiğit, Uğur
    Boyabatlı, Kenan Evren
    [J]. Automation in Construction, 2024, 168
  • [10] Holistic approach to risk management urged
    Hanson, D
    [J]. CHEMICAL & ENGINEERING NEWS, 1996, 74 (26) : 9 - 10