共 50 条
- [41] Stiffness damage assement of prestressed concrete box-girder after cracking [J]. Gongcheng Lixue/Engineering Mechanics, 2015, 32 (07): : 95 - 102
- [45] LONGEST PRECAST CONCRETE BOX-GIRDER BRIDGE IN WESTERN HEMISPHERE [J]. CIVIL ENGINEERING, 1974, 44 (03): : 56 - 60
- [47] Remotely Controllable SHM System for a Concrete Box-girder Bridge [J]. EMBODING INTELLIGENCE IN STRUCTURES AND INTEGRATED SYSTEMS, 2009, 56 : 339 - +
- [48] Live Load Factors for Serviceability Limit State of Prestressed Concrete Girder Stresses [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, RESILIENCE AND SUSTAINABILITY, 2012, : 3183 - 3190