Maintenance of buildings: Italian examples of deviations between planned and incurred costs

被引:3
|
作者
Rebaudengo, Manuela [1 ]
Piantanida, Paolo [2 ]
机构
[1] Politecn Torino DIST, Viale Mattioli 39, I-10125 Turin, Italy
[2] Politecn Torino DISEG, Corso Duca Abruzzi 24, I-10125 Turin, Italy
关键词
D O I
10.1088/1757-899X/351/1/012013
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In recent years, drawing up the maintenance plan for a building has proved to be a theoretical practice, which has been expressed in the indication of a multiplicity of interventions more for caution reasons than for real needs. In this way, the document (mandatory by the Italian law both for public and private works) has been interpreted as a formal requirement: it must be part of the project, without any particular operational interest. So, the maintenance plans are more often "standard plans", not directing the user towards a specific maintenance strategy and thus consolidating the common thesis that reality is different. The paper compares, with reference to two xxx of study (offices and residence), the planned maintenance actions and those carried out, with an indication of the difference between expected and incurred costs.
引用
收藏
页数:5
相关论文
共 50 条