Reliability worth evaluation for distribution system planning and operation using improved actual performance data

被引:0
|
作者
Eua-Arporn, B [1 ]
Yokoyama, A [1 ]
Audomvongseree, K [1 ]
机构
[1] Chulalongkorn Univ, Fac Engn, Dept Elect Engn, Bangkok, Thailand
关键词
reliability worth; actual performance data; distribution system; customer damage model; customer outage cost;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
It is widely known that in reliability cost/worth analysis, customer outage cost should be taken into account for the delivery of energy services. Several methodologies have been proposed. However, these methods require a lot of long term statistical data e.g. failure and repair rates, which may not be available at present in developing countries. There are some researches considering reliability cost/worth in term of Actual Performance data. Nevertheless, this method can only evaluate the past performance indices according to its past actual performance data. From this reason, it may not be possible to make a reasonable decision in distribution system planning and design. This paper proposes an approach to cope with this problem. The past performance data and the targets of system planning, customer average interruption duration index (CAIDI) and average power not supplied (APNS), will be used to generate the expect interruption events. To handle the uncertainty in setting the system targets, fuzzy concept is then applied. In this paper the proposed method together with Thailand's customer damage model (CCDF), obtained from the study conducted in the years 2000-2001, is employed to evaluate the reliability worth of the distribution system in Thailand.
引用
收藏
页码:74 / 79
页数:6
相关论文
共 50 条
  • [41] Optimal planning of battery energy storage considering reliability benefit and operation strategy in active distribution system
    Wenxia LIU
    Shuya NIU
    Huiting XU
    JournalofModernPowerSystemsandCleanEnergy, 2017, 5 (02) : 177 - 186
  • [42] Optimal planning of battery energy storage considering reliability benefit and operation strategy in active distribution system
    Liu, Wenxia
    Niu, Shuya
    Xu, Huiting
    JOURNAL OF MODERN POWER SYSTEMS AND CLEAN ENERGY, 2017, 5 (02) : 177 - 186
  • [43] Reliability worth applied to transmission expansion planning based on ant colony system
    Leite da Silva, Armando M.
    Rezende, Leandro S.
    da Fonseca Manso, Luiz A.
    de Resende, Leonidas C.
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2010, 32 (10) : 1077 - 1084
  • [44] Distribution reliability assessment distribution power system reliability data collection
    Pearson, D
    2002 IEEE POWER ENGINEERING SOCIETY SUMMER MEETING, VOLS 1-3, CONFERENCE PROCEEDINGS, 2002, : 788 - 788
  • [45] Integration of High Reliability Distribution System in Microgrid Operation
    Khodayar, Mohammad E.
    Barati, Masoud
    Shahidehpour, Mohammad
    IEEE TRANSACTIONS ON SMART GRID, 2012, 3 (04) : 1997 - 2006
  • [46] Loss and reliability optimization for power distribution system operation
    Vitorino, R. M.
    Jorge, H. M.
    Neves, L. P.
    ELECTRIC POWER SYSTEMS RESEARCH, 2013, 96 : 177 - 184
  • [47] The reliability evaluation of distribution power system
    Stojkov, M
    Mravak, I
    Nikolovski, S
    SAFETY AND RELIABILITY, VOLS 1 & 2, 1999, : 341 - 346
  • [48] Reliability evaluation system of distribution network
    Gui, Min
    Luo, An
    Shen, Qinan
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2002, 26 (24): : 31 - 33
  • [49] Evaluation of operation performance of a multi-chiller system using a data-based chiller model
    Wang, Yijun
    Jin, Xinqiao
    Du, Zhimin
    Zhu, Xu
    ENERGY AND BUILDINGS, 2018, 172 : 1 - 9
  • [50] Improved Performance of Hive using Index-Based Operation on Big Data
    Suman, Akshay Kumar
    Gyanchandani, Manasi
    PROCEEDINGS OF THE 2018 SECOND INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTING AND CONTROL SYSTEMS (ICICCS), 2018, : 1974 - 1978