Motion planning of a steam generator mobile tube-inspection robot

被引:4
|
作者
Xu, Biying [1 ]
Li, Ge [1 ]
Zhang, Kuan [1 ]
Cai, Hegao [1 ]
Zhao, Jie [1 ]
Fan, Jizhuang [1 ]
机构
[1] Harbin Inst Technol, State Key Lab Robot & Syst, Harbin 150001, Peoples R China
基金
中国国家自然科学基金;
关键词
Steam generator mobile tube-inspection robot; Motion planning; Base position; Optimization; Path planning; Comprehensive evaluation index; A-ASTERISK ALGORITHM;
D O I
10.1016/j.net.2021.10.005
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
Under the influence of nuclear radiation, the reliability of steam generators (SGs) is an important factor in the efficiency and safety of nuclear power plant (NPP) reactors. Motion planning that remotely manipulates an SG mobile tube-inspection robot to inspect SG heat transfer tubes is the mainstream trend of NPP robot development. To achieve motion planning, conditional traversal is usually used for base position optimization, and then the A* algorithm is used for path planning. However, the proposed approach requires considerable processing time and has a single expansion during path planning and plan paths with many turns, which decreases the working speed of the robot. Therefore, to reduce the calculation time and improve the efficiency of motion planning, modifications such as the matrix method, improved parent node, turning cost, and improved expanded node were proposed in this study. We also present a comprehensive evaluation index to evaluate the performance of the improved algorithm. We validated the efficiency of the proposed method by planning on a tube sheet with square-type tube arrays and experimenting with Model SG. (C) 2021 Korean Nuclear Society, Published by Elsevier Korea LLC.
引用
收藏
页码:1374 / 1381
页数:8
相关论文
共 50 条
  • [11] The SG-Climbot: An Adaptable, Efficient, Inspection and Repair Robot for Steam Generator Heat Transfer Tube Sheet
    Liu, Zhaojin
    Li, Jiawei
    Chen, Jian
    Li, Sicen
    Gu, Xin
    Jiang, Jikai
    Li, Yuxiao
    Yao, Shaoming
    Wang, Gang
    JOURNAL OF FIELD ROBOTICS, 2024,
  • [12] Meeting Steam Generator Tube Inspection Needs in Nuclear Power Plants
    Udpa, Lalita
    Ramuhalli, Pradeep
    Benson, James
    Udpa, Satish
    ELECTROMAGNETIC NONDESTRUCTIVE EVALUATION (XII), 2009, 32 : 4 - 4
  • [13] A Sensor Placement Algorithm for a Mobile Robot Inspection Planning
    Faigl, Jan
    Kulich, Miroslav
    Preucil, Libor
    JOURNAL OF INTELLIGENT & ROBOTIC SYSTEMS, 2011, 62 (3-4) : 329 - 353
  • [14] A Sensor Placement Algorithm for a Mobile Robot Inspection Planning
    Jan Faigl
    Miroslav Kulich
    Libor Přeučil
    Journal of Intelligent & Robotic Systems, 2011, 62 : 329 - 353
  • [15] Motion Planning of LineClimber, a Robot for Inspection of Transmission Lines
    Fang, Lijin
    Tao, Guanghong
    Wei, Yongle
    MECHATRONICS AND APPLIED MECHANICS II, PTS 1 AND 2, 2013, 300-301 : 449 - 452
  • [16] An interactive tool for mobile robot motion planning
    Guzman, J. L.
    Berenguel, A.
    Rodriguez, F.
    Dormido, S.
    ROBOTICS AND AUTONOMOUS SYSTEMS, 2008, 56 (05) : 396 - 409
  • [17] Motion planning for nonholonomic tracked mobile robot
    Kang, Liang
    Wang, Jian-Jun
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2012, 46 (SUPPL. 1): : 28 - 30
  • [18] Optimal Motion Planning for Mobile Welding Robot
    Pan, Gen
    Guan, Enguang
    Yang, Fan
    Ren, Anye
    Gao, Peng
    INTELLIGENT ROBOTICS AND APPLICATIONS, ICIRA 2017, PT II, 2017, 10463 : 124 - 134
  • [19] MOTION PLANNING FOR A MOBILE ROBOT WITH A KINEMATIC CONSTRAINT
    TOURNASSOUD, P
    LECTURE NOTES IN COMPUTER SCIENCE, 1989, 391 : 150 - 171
  • [20] Optimal motion planning for a wheeled mobile robot
    Weiguo, Wu
    Huitang, Chen
    Peng-Yung, Woo
    Proceedings - IEEE International Conference on Robotics and Automation, 1999, 1 : 41 - 46