Motion planning of a steam generator mobile tube-inspection robot

被引:4
|
作者
Xu, Biying [1 ]
Li, Ge [1 ]
Zhang, Kuan [1 ]
Cai, Hegao [1 ]
Zhao, Jie [1 ]
Fan, Jizhuang [1 ]
机构
[1] Harbin Inst Technol, State Key Lab Robot & Syst, Harbin 150001, Peoples R China
基金
中国国家自然科学基金;
关键词
Steam generator mobile tube-inspection robot; Motion planning; Base position; Optimization; Path planning; Comprehensive evaluation index; A-ASTERISK ALGORITHM;
D O I
10.1016/j.net.2021.10.005
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
Under the influence of nuclear radiation, the reliability of steam generators (SGs) is an important factor in the efficiency and safety of nuclear power plant (NPP) reactors. Motion planning that remotely manipulates an SG mobile tube-inspection robot to inspect SG heat transfer tubes is the mainstream trend of NPP robot development. To achieve motion planning, conditional traversal is usually used for base position optimization, and then the A* algorithm is used for path planning. However, the proposed approach requires considerable processing time and has a single expansion during path planning and plan paths with many turns, which decreases the working speed of the robot. Therefore, to reduce the calculation time and improve the efficiency of motion planning, modifications such as the matrix method, improved parent node, turning cost, and improved expanded node were proposed in this study. We also present a comprehensive evaluation index to evaluate the performance of the improved algorithm. We validated the efficiency of the proposed method by planning on a tube sheet with square-type tube arrays and experimenting with Model SG. (C) 2021 Korean Nuclear Society, Published by Elsevier Korea LLC.
引用
收藏
页码:1374 / 1381
页数:8
相关论文
共 50 条
  • [1] DEVELOPMENT OF A STEAM GENERATOR TUBE INSPECTION ROBOT WITH A SUPPORTING LEG
    Shin, Hocheol
    Jeong, Kyung-Min
    Jung, Seungho
    Kim, Seungho
    NUCLEAR ENGINEERING AND TECHNOLOGY, 2009, 41 (01) : 125 - 134
  • [2] Motion planning for a quadruped robot in heat transfer tube inspection
    Li, Jiawei
    Liu, Zhaojin
    Li, Sicen
    Jiang, Jikai
    Li, Yuxiao
    Tian, Changda
    Wang, Gang
    Automation in Construction, 2024, 168
  • [3] STEAM-GENERATOR TUBE INSPECTION USING EMATS
    MAXFIELD, B
    HULBERT, K
    GLASS, W
    FORTUNKO, C
    MATERIALS EVALUATION, 1986, 44 (09) : 26 - 27
  • [4] INSPECTION AND REPAIR OF STEAM-GENERATOR TUBING WITH A ROBOT
    BOEHM, HH
    FORCH, H
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1985, 50 (NOV): : 608 - 609
  • [5] Research on Path Planning and Motion Control Technology for Mobile Robot Doing Inspection
    Che, Hongjuan
    Gao, Xueshan
    Zhao, Peng
    Ye, Junjie
    Hao, Liangchao
    Niu, Jundao
    PROCEEDINGS OF 2022 IEEE INTERNATIONAL CONFERENCE ON MECHATRONICS AND AUTOMATION (IEEE ICMA 2022), 2022, : 1581 - 1586
  • [6] Automated Data Analysis System for Steam Generator Tube Inspection
    Majumdar, S.
    Ramakrishnan, S.
    Ramuhalli, P.
    Udpa, L.
    Udpa, S.
    Benson, J.
    Williams, R.
    Bipes, T. U.
    MATERIALS EVALUATION, 2011, 69 (02) : 201 - 207
  • [7] Online Motion Planning For Mobile Robot
    Jiono, Mahfud
    Mahandi, Yogi Dwi
    Rahmawati, Yuni
    Putro, Setiadi Cahyono
    Ardiyansyah, Firman
    Prasetyo, Dedi
    2019 INTERNATIONAL CONFERENCE ON ELECTRICAL, ELECTRONICS AND INFORMATION ENGINEERING (ICEEIE), 2019, : 85 - 89
  • [8] On Layered Motion Planning for Mobile Robot
    Wang Hong
    Zhou Yue
    PROCEEDINGS OF THE 27TH CHINESE CONTROL CONFERENCE, VOL 5, 2008, : 365 - 368
  • [9] AN APPROACH FOR THE MOTION PLANNING OF A MOBILE ROBOT
    WANG, B
    DALY, C
    SCOTT, M
    RYAN, M
    IRISH JOURNAL OF PSYCHOLOGY, 1993, 14 (03): : 512 - 513
  • [10] The SG-Climbot: An Adaptable, Efficient, Inspection and Repair Robot for Steam Generator Heat Transfer Tube Sheet
    Liu, Zhaojin
    Li, Jiawei
    Chen, Jian
    Li, Sicen
    Gu, Xin
    Jiang, Jikai
    Li, Yuxiao
    Yao, Shaoming
    Wang, Gang
    Journal of Field Robotics, 2024,