Capacitated lot sizing and sequence dependent setup scheduling: an iterative approach for integration

被引:27
|
作者
Mateus, Geraldo R. [2 ]
Ravetti, Martin G. [2 ]
de Souza, Mauricio C. [1 ]
Valeriano, Tais M. [1 ]
机构
[1] Univ Fed Minas Gerais, Dept Prod Engn, BR-31270901 Belo Horizonte, MG, Brazil
[2] Univ Fed Minas Gerais, Dept Ciencia Comp, BR-31270901 Belo Horizonte, MG, Brazil
关键词
Lot sizing; Unrelated parallel machines scheduling; Sequence dependent setup; Changeover setup; SHIFTING BOTTLENECK PROCEDURE; TRAVELING SALESMAN PROBLEM; PARALLEL MACHINES; UP TIMES; ALGORITHM; COSTS; MODEL;
D O I
10.1007/s10951-009-0156-2
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider here the lot sizing and scheduling problem in single-level manufacturing systems. The shop floor is composed of unrelated parallel machines with sequence dependent setup times. We propose an integer programming model embedding precise capacity information due to scheduling constraints in a classical lot-sizing model. We also propose an iterative approach to generate a production plan taking into account scheduling constraints due to changeover setup times. The procedure executes two decision modules per iteration: a lot-sizing module and a scheduling module. The capacitated lot-sizing problem is solved to optimality considering estimated data and aggregate information, and the scheduling problem is solved by a GRASP heuristic. In the proposed scheme the information flow connecting the two levels is managed in each iteration. We report a set of computational experiments and discuss future work.
引用
收藏
页码:245 / 259
页数:15
相关论文
共 50 条
  • [21] A note on capacitated lot sizing with setup carry over
    Briskorn, Dirk
    IIE TRANSACTIONS, 2006, 38 (11) : 1045 - 1047
  • [22] A Horizon Decomposition Approach for the Capacitated Lot-Sizing Problem with Setup Times
    Fragkos, Ioannis
    Degraeve, Zeger
    De Reyck, Bert
    INFORMS JOURNAL ON COMPUTING, 2016, 28 (03) : 465 - 482
  • [23] MULTIPLE-STAGE MULTIPLE-MACHINE CAPACITATED LOT-SIZING AND SCHEDULING WITH SEQUENCE-DEPENDENT SETUP: A CASE STUDY IN THE WHEEL INDUSTRY
    Deeratanasrikul, Lalida
    Mizuno, Shinji
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2017, 13 (01) : 411 - 426
  • [24] The capacitated lot sizing problem with overtime decisions and setup times
    Özdamar, L
    Bozyel, MA
    IIE TRANSACTIONS, 2000, 32 (11) : 1043 - 1057
  • [25] A capacitated lot sizing problem with stochastic setup times and overtime
    Tas, Duygu
    Gendreau, Michel
    Jabali, Ola
    Jans, Raf
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 273 (01) : 146 - 159
  • [26] The capacitated lot sizing problem with setup carry-over
    Sox, CR
    Gao, YB
    IIE TRANSACTIONS, 1999, 31 (02) : 173 - 181
  • [27] An analysis of formulations for the capacitated lot sizing problem with setup crossover
    Fiorotto, Diego Jacinto
    Jans, Raf
    de Araujo, Silvio Alexandre
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 106 : 338 - 350
  • [28] LTO heuristics for capacitated lot sizing problem with sequence dependent setups and overtimes
    Lukac, Z
    Soric, K
    Rosenzweig, VV
    SOR 05 Proceedings, 2005, : 383 - 388
  • [29] Period Decompositions for the Capacitated Lot Sizing Problem with Setup Times
    de Araujo, Silvio Alexandre
    De Reyck, Bert
    Degraeve, Zeger
    Fragkos, Ioannis
    Jans, Raf
    INFORMS JOURNAL ON COMPUTING, 2015, 27 (03) : 431 - 448
  • [30] CAPACITATED LOT-SIZING AND SCHEDULING BY LAGRANGEAN RELAXATION
    DIABY, M
    BAHL, HC
    KARWAN, MH
    ZIONTS, S
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 59 (03) : 444 - 458