A comparison of flow shop based heuristics for group scheduling

被引:0
|
作者
Schaller, JE [1 ]
机构
[1] Eastern Connecticut State Univ, Dept Business Adm, Willimantic, CT 06226 USA
关键词
D O I
暂无
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
This paper proposes two new heuristic procedures for the group scheduling problem. These procedures extend the CDS and NEH flow shop scheduling procedures to the group scheduling problem. The two new procedures and two procedures previously developed by Wemmerlov and Vakharia [4] are tested on several problem sets with varying numbers of families, jobs and machines, and varying setup time distributions. The procedures are evaluated on the basis of the makespans for the solutions that were generated. The results show that the new procedures generate solutions with improved makespans.
引用
收藏
页码:1138 / 1140
页数:3
相关论文
共 50 条
  • [1] A performance comparison of alternative heuristics for the Flow Shop Scheduling problem
    Esquivel, S
    Leguizamón, G
    Zuppa, F
    Gallard, R
    [J]. APPLICATIONS OF EVOLUTIONARY COMPUTING, PROCEEDINGS, 2002, 2279 : 51 - 60
  • [2] Comparative analysis of group scheduling heuristics in a flow shop cellular system
    Leu, BY
    Nazemetz, JW
    [J]. INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1995, 15 (09) : 143 - &
  • [3] Heuristics based hybrid approach of flow shop scheduling problem
    Lokesh, K.
    Jayaprakash, J.
    Alene, Tibebu
    [J]. 4TH INTERNATIONAL CONFERENCE ON DESIGN, ANALYSIS, MANUFACTURING AND SIMULATION (ICDAMS 2020), 2020, 992
  • [4] Comparison of Initial Solutions of Heuristics for No-wait Flow Shop Scheduling
    Sapkal, Sagar
    Laha, Dipak
    [J]. COMPUTATIONAL INTELLIGENCE AND INFORMATION TECHNOLOGY, 2011, 250 : 294 - 298
  • [5] A note on heuristics of flow-shop scheduling
    Lai, TC
    [J]. OPERATIONS RESEARCH, 1996, 44 (04) : 648 - 652
  • [6] Heuristics for scheduling in a flow shop with multiple processors
    Brah, SA
    Loo, LL
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 113 (01) : 113 - 122
  • [7] A Heuristics Based on RA for Two-stage Flexible Flow Shop Scheduling with Head Group Constraint
    Li, Zhantao
    Chen, Qingxin
    Mao, Ning
    [J]. ADVANCES IN ENGINEERING DESIGN AND OPTIMIZATION II, PTS 1 AND 2, 2012, 102-102 : 783 - 789
  • [8] Constructive Heuristics Comparison in Hybrid Flow Shop Scheduling Environments with Missing Operations
    Dios, Manuel
    Manuel Framinan, Jose
    [J]. 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 858 - 868
  • [9] 4 SIMPLE HEURISTICS FOR SCHEDULING A FLOW-SHOP
    GELDERS, LF
    SAMBANDAM, N
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1978, 16 (03) : 221 - 231
  • [10] A Comparison of Constructive Heuristics with the Objective of Minimizing Makespan in the Flow-Shop Scheduling Problem
    Semanco, Pavol
    Modrak, Vladimir
    [J]. ACTA POLYTECHNICA HUNGARICA, 2012, 9 (05) : 177 - 190