摘要
Determining an optimal schedule to minimise the completion time of the last job abandoning the system (makespan) become a very difficult problem when there are more than two machines in the flow shop. Due, both to its economical impact and complexity, attention to solve this problem has been paid by many researchers. Starting with the Johnson's exact algorithm for the two-machine makespan problem [1], over the past three decades extensive search have been done on pure m-machine flow shop problems. Many researchers faced the Flow Shop Scheduling (FSSP) by means of well-known heuristics which, are successfully used for certain instances of the problem and providing a single acceptable solution. Current trends to solve the FSSP involve Evolutionary Computation and Ant Colony paradigms.. This work shows different bio-inspired heuristics for the FSSP, including hybrid versions of enhanced multirecombined evolutionary algorithms and ant colony algorithms [2], on a set of flow shop scheduling instances. A discussion on implementation details, analysis and a comparison of different approaches to the problem is shown.
引用
收藏
页码:51 / 60
页数:10
相关论文
共 50 条
  • [1] A comparison of flow shop based heuristics for group scheduling
    Schaller, JE
    DECISION SCIENCES INSTITUTE, 1997 ANNUAL MEETING, PROCEEDINGS, VOLS 1-3, 1997, : 1138 - 1140
  • [2] A Comparison of Constructive Heuristics with the Objective of Minimizing Makespan in the Flow-Shop Scheduling Problem
    Semanco, Pavol
    Modrak, Vladimir
    ACTA POLYTECHNICA HUNGARICA, 2012, 9 (05) : 177 - 190
  • [3] Efficient heuristics for the parallel blocking flow shop scheduling problem
    Ribas, Imma
    Companys, Ramon
    Tort-Martorell, Xavier
    EXPERT SYSTEMS WITH APPLICATIONS, 2017, 74 : 41 - 54
  • [4] Handling ties in heuristics for the permutation flow shop scheduling problem
    Vasiljevic, Dragan
    Danilovic, Milos
    JOURNAL OF MANUFACTURING SYSTEMS, 2015, 35 : 1 - 9
  • [5] Evaluating the performance of constructive heuristics for the blocking flow shop scheduling problem with setup times
    Takano, Mauricio Iwama
    Nagano, Marcelo Seido
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2019, 10 (01) : 37 - 50
  • [6] Heuristics based hybrid approach of flow shop scheduling problem
    Lokesh, K.
    Jayaprakash, J.
    Alene, Tibebu
    4TH INTERNATIONAL CONFERENCE ON DESIGN, ANALYSIS, MANUFACTURING AND SIMULATION (ICDAMS 2020), 2020, 992
  • [7] Comparison of three meta heuristics to optimize hybrid flow shop scheduling problem with parallel machines
    Syam, Wahyudin P.
    Al-Harkan, Ibrahim M.
    World Academy of Science, Engineering and Technology, 2010, 62 : 271 - 278
  • [8] Comparison of three meta heuristics to optimize hybrid flow shop scheduling problem with parallel machines
    Syam, Wahyudin P.
    Al-Harkan, Ibrahim M.
    World Academy of Science, Engineering and Technology, 2010, 38 : 919 - 926
  • [9] Efficient heuristics for the hybrid flow shop scheduling problem with missing operations
    Dios, Manuel
    Fernandez-Viagas, Victor
    Framinan, Jose M.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 115 : 88 - 99
  • [10] Heuristics for solving flow shop scheduling problem under resources constraints
    Laribi, Imane
    Yalaoui, Farouk
    Belkaid, Faycal
    Sari, Zaki
    IFAC PAPERSONLINE, 2016, 49 (12): : 1478 - 1483