An improved algorithm for a two-stage production scheduling problem with an outsourcing option

被引:0
|
作者
Jiang, Xiaojuan [1 ]
Zhang, An [2 ]
Chen, Yong [2 ]
Chen, Guangting [3 ]
Lee, Kangbok [1 ]
机构
[1] Pohang Univ Sci & Technol, Dept Ind & Management Engn, Pohang 37673, South Korea
[2] Hangzhou Dianzi Univ, Dept Math, Hangzhou 310018, Peoples R China
[3] Taizhou Univ, Taizhou 317000, Peoples R China
基金
中国国家自然科学基金; 新加坡国家研究基金会;
关键词
Scheduling; Flow shop; Outsourcing; Approximation algorithm; Worst-case analysis; OPTIMIZATION; MANUFACTURER; DECISIONS;
D O I
10.1016/j.tcs.2021.05.022
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
We consider a two-stage production scheduling problem where each operation can be outsourced or processed in-house. For each operation in the same machine, the ratio of its outsourcing cost to its processing time is constant. The objective is to minimize the sum of the makespan and the total outsourcing cost. It is known that this problem is either polynomial time solvable or NP-hard according to the conditions of the ratios. Even though approximation algorithms for NP-hard cases had been developed, their tight worst-case performance ratios are still open. In this paper, we carefully analyze the approximation algorithms to identify their tight worst-case performance ratios for cases. In one case, we propose a new approximation algorithm with a better and tight worst-case performance ratio. In the process of analyzing the algorithm, we propose a technique utilizing nonlinear optimization. (C) 2021 Elsevier B.V. All rights reserved.
引用
收藏
页码:59 / 69
页数:11
相关论文
共 50 条
  • [31] A discrete PSO for two-stage assembly scheduling problem
    Tian, Ye
    Liu, Dayou
    Yuan, Donghui
    Wang, Kunhao
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 66 (1-4): : 481 - 499
  • [32] An Improved Two-stage Acquisition Algorithm in DSSS
    Zhan Yunzhi
    Gan Minggang
    [J]. 2011 7TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING (WICOM), 2011,
  • [33] Solving the spatial scheduling problem: a two-stage approach
    Zhang, Zhiying
    Chen, Jie
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (10) : 2732 - 2743
  • [34] A discrete PSO for two-stage assembly scheduling problem
    Ye Tian
    Dayou Liu
    Donghui Yuan
    Kunhao Wang
    [J]. The International Journal of Advanced Manufacturing Technology, 2013, 66 : 481 - 499
  • [35] Power system state scheduling with the two-stage problem
    Palamarchuk, SI
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (02) : 439 - 445
  • [36] A test scheduling algorithm based on two-stage GA
    Yu, Y.
    Peng, X. Y.
    Peng, Y.
    [J]. 4TH INTERNATIONAL SYMPOSIUM ON INSTRUMENTATION SCIENCE AND TECHNOLOGY (ISIST' 2006), 2006, 48 : 658 - 662
  • [37] A novel genetic algorithm for solving production and transportation scheduling in a two-stage supply chain
    Zegordi, S. H.
    Abadi, I. N. Kamal
    Nia, M. A. Beheshti
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 58 (03) : 373 - 381
  • [38] Scheduling two-stage production lines with multiple machines
    Qi, M
    [J]. PRODUCTION PLANNING & CONTROL, 1996, 7 (04) : 418 - 429
  • [39] A Two-stage Heuristic Method for Vulcanization Production Scheduling
    Yu, Shengping
    Yang, Diancai
    Wang, Xiuying
    Zhu, Kehui
    Zheng, Binglin
    [J]. 2011 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, 2011, : 3601 - 3605
  • [40] An improved shuffled frog leaping algorithm for the distributed two-stage hybrid flow shop scheduling
    Lei D.-M.
    Wang T.
    [J]. Lei, De-Ming (deminglei11@163.com), 1600, Northeast University (36): : 241 - 248