The evolutionary development of the methodology of operational planning of construction production

被引:0
|
作者
Slavin, Alexey [1 ]
Sinenko, Sergey [1 ]
Yoshin, Nikita [1 ]
机构
[1] Moscow State Univ Civil Engn, Yaroslavskoe Shosse 26, Moscow 129337, Russia
关键词
D O I
10.1088/1757-899X/365/6/062040
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The article describes a pilot implementation in the area of specialized work in the company "Stroy-West" system "Last planner". In the course of implementation, it was concluded that accurate planning can increase the productivity of construction activities, improve the efficiency of resource use. Usually, the significant part of the construction preparation process is reflected in business plans, which simplifies the design and content of the calculations. Meanwhile, this significantly deteriorates the quality of preparation process, and then the construction organization process, all the nuances of which must be determined by the project of organization of work, which establishes the process sequence and methods of organization of works on issue of the company's products. The need in material and technical resources can be assessed by two methods. The first method is the direct counting method which suggests evaluation of the material need based on the amount of work multiplied with corresponding consumption rate or by technology cards that indicating the requirement of vehicles, mechanisms, outfit, etc. by piece. Such method focuses on standards associated with the cost of the product. This method is most suitable for the purchase of simple items used in mass and impersonal way (fasteners, hardware, packaging material, etc.) by all divisions of the company. At the same time, operational control by itself is not decisive because is limited by information of organizational and managerial content. A comprehensive forecast of the costs of planning are the main preliminary factors for the successful construction management. "The last planner" can be consistently used, engineers-planners to make project schedules more predictable and to increase the likelihood that a workflow will flow evenly and projects are completed on time.
引用
收藏
页数:7
相关论文
共 50 条
  • [31] SOME OPERATIONAL PROBLEMS OF RURAL DEVELOPMENT PLANNING
    GEORGULAS, N
    [J]. INTERNATIONAL DEVELOPMENT REVIEW, 1969, 11 (02) : 19 - 21
  • [32] Development and Evaluation of an Intuitive Operational Planning Process
    Bryant, David J.
    Martin, Lora Bruyn
    Bandali, Farahnaz
    Rehak, Lisa
    Vokac, Robert
    Lamoureux, Tab
    [J]. JOURNAL OF COGNITIVE ENGINEERING AND DECISION MAKING, 2007, 1 (04) : 434 - 460
  • [33] Operational site planning and development in metropolitan regions
    Betriebliche standortplanung und -entwicklung in Metropolregionen: Einblicke in die unternehmens- und kommunenseitige Beeinflussbarkeit qualitativer und quantitativer regionaler Standortfaktoren
    [J]. 2018, Carl Hanser Verlag (113): : 7 - 8
  • [34] PLANNING AND CONSTRUCTION OF PRODUCTION SITES ABROAD
    HENN, W
    VOSS, W
    [J]. WERKSTATTSTECHNIK ZEITSCHRIFT FUR INDUSTRIELLE FERTIGUNG, 1976, 66 (10): : 577 - 582
  • [35] Hybrid Approach to Solving the Problems of Operational Production Planning
    Gladkov, L. A.
    Gladkova, N. V.
    Gromov, S. A.
    [J]. ARTIFICIAL INTELLIGENCE AND ALGORITHMS IN INTELLIGENT SYSTEMS, 2019, 764 : 415 - 424
  • [36] Operational Job Order Planning to increase Production Efficiency
    Meyer, Heiko
    [J]. ATP EDITION, 2009, (05): : 13 - 16
  • [37] Operational planning framework for multisite production and distribution networks
    Verderame, Peter M.
    Floudas, Christodoulos A.
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2009, 33 (05) : 1036 - 1050
  • [38] DETERMINATION OF TECHNICAL AND OPERATIONAL PLANNING INFORMATION FOR CROP PRODUCTION
    ROSEGGER, S
    SORGEL, FP
    [J]. LANDBAUFORSCHUNG VOLKENRODE, 1976, : 1 - 135
  • [39] A Production Planning and Control Methodology Proposal for Shipyards
    Kafali, Mustafa
    Unsan, Yalcin
    Ozkok, Murat
    [J]. JOURNAL OF ETA MARITIME SCIENCE, 2018, 6 (01) : 47 - 59
  • [40] Multiobjective Evolutionary Model of the Construction Industry Based on Network Planning
    Yu, Dehu
    Lv, Qing
    Srivastava, Gautam
    Chen, Chun-Hao
    Lin, Jerry Chun-Wei
    [J]. IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2023, 19 (02) : 2173 - 2182