Research on the Assessment of China's Energy Security Risk and Grey Model Based Early Warning System

被引:0
|
作者
Wang Shuzhen [1 ]
Wei Hua [1 ,2 ]
He Jingfeng [2 ]
机构
[1] Shanghai Lixin Univ Commerce, Risk Management Res Inst, Shanghai 201620, Peoples R China
[2] China Univ Min & Technol, Sch Chem Engn & Technol, Xuzhou 221008, Peoples R China
关键词
Energy Security; Early Warning System; Fuzzy Comprehensive Evaluation; Entropy Weight;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The energy safety risk early warning system was designed with the classification of primary energy structure. The energy system was divided into two levels, including a total of 37 indicators. The China's energy risk early warning system was established using the method of fuzzy comprehensive evaluation and entropy weight combination. The demonstration analysis was conducted using the data from the year of 1995 to 2008 and it was concluded that the energy security situation was relatively stable in the recent years. The entire situation of energy security of China during the year of 2009 to 2010 was predicted based on grey model and the conclusion that the energy risk early warning index was between the worthing attention and danger and only coal sub-system was in a safe state.
引用
收藏
页码:468 / +
页数:3
相关论文
共 50 条
  • [21] Research on the Synergetic Model of Collecting Early Warning Information on Public Security Incidents in China
    Zhu Xiao-ning
    Luo Min
    PROCEEDINGS OF 2015 INTERNATIONAL CONFERENCE ON PUBLIC ADMINISTRATION (11TH) VOL I, 2015, : 745 - 750
  • [22] Early Warning System Based On Power System Steady State and Dynamic Security Assessment
    Samet, Haidar
    Rashidi, Mehran
    JOURNAL OF ELECTRICAL SYSTEMS, 2015, 11 (03) : 249 - 257
  • [23] Agent-based reference model for China energy forecasting and early-warning system
    Tian, Zhiyong
    Guan, Zhongliang
    Wang, Siqiang
    Zheng, Feng
    ISCRAM CHINA 2007: Proceedings of the Second International Workshop on Information Systems for Crisis Response and Management, 2007, : 11 - 16
  • [24] Early Warning System of Financial Risk of China's Foreign Investment
    Yang, Liuyong
    Zhang, Jingjing
    FOREIGN DIRECT INVESTMENT, TRADE AND DEVELOPMENT, 2011, : 221 - 227
  • [25] China's energy supply and demand contradiction early-warning based on system dynamics
    Zhang, Minghui
    Song, Xuefeng
    Li, Yongfeng
    PROCEEDINGS OF THE 2007 CONFERENCE ON SYSTEMS SCIENCE, MANAGEMENT SCIENCE AND SYSTEM DYNAMICS: SUSTAINABLE DEVELOPMENT AND COMPLEX SYSTEMS, VOLS 1-10, 2007, : 2853 - 2858
  • [26] Research on the FinTech risk early warning based on the MS-VAR model: An empirical analysis in China
    Bu, Ya
    Du, Xin
    Li, Hui
    Yu, Xinghui
    Wang, Yuting
    GLOBAL FINANCE JOURNAL, 2023, 58
  • [27] Research on China's Legal Protection System for Energy Security
    Xiang, Bo
    Liu, Cai
    ENERGY AND POWER TECHNOLOGY, PTS 1 AND 2, 2013, 805-806 : 1466 - 1471
  • [28] Research on Business Risk Assessment Model of City Commercial Banks Based on Grey System Theory
    Ren, Shuming
    Wang, Dandan
    Wang, Hongjing
    APPLIED INFORMATICS AND COMMUNICATION, PT 5, 2011, 228 : 30 - 37
  • [29] Research on Business Risk Assessment Model of City Commercial Banks based on Grey System Theory
    Ren, Shuming
    Wang, Dandan
    Wang, Hongjing
    2010 THE 3RD INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND INDUSTRIAL APPLICATION (PACIIA2010), VOL V, 2010, : 28 - 31
  • [30] Private College's Education Risk Assessment and Early Warning Mechanism Research Based on the Extension Matter-Element Model
    Wang, Dongling
    2015 2ND INTERNATIONAL CONFERENCE ON CREATIVE EDUCATION (ICCE 2015), PT 1, 2015, 10 : 413 - 418