POSITIVE TRAIN CONTROL IN NORTH AMERICA

被引:6
|
作者
Lindsey, Ronald
机构
来源
IEEE VEHICULAR TECHNOLOGY MAGAZINE | 2009年 / 4卷 / 04期
关键词
D O I
10.1109/MVT.2009.934666
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The positive train control (PTC) which is referred to as communication-based train management (CBTM) is discussed. PTC's core objectives are keep trains from hitting trains and overspeeding and protect workers in work zones. The wireless data platform that supports PTC can also be used for improved resource management. The degree and types of warning and action statements are very subjective, and they are generated based on the use of a continuous prediction process as the train moves down the track. PTC systems provide safeguards against potentially dangerous train-crew errors by bringing a train to a stop when the system determines that the train will exceed (predictive enforcement) its movement authority or track-specific restrictions or has already done so (reactive enforcement) when a prediction capability is not available. The PTC system should operate independent of dispatcher involvement and be transparent to the traffic management processes.
引用
收藏
页码:22 / 26
页数:5
相关论文
共 50 条
  • [21] Biological air pollution control in North America
    Skladany, G
    Leson, G
    Hodge, D
    GEFAHRSTOFFE REINHALTUNG DER LUFT, 1996, 56 (7-8): : 313 - 316
  • [22] Impact and control of peach mosaic in North America
    Larsen, HJ
    17TH INTERNATIONAL SYMPOSIUM ON VIRUS AND VIRUS-LIKE DISEASES OF TEMPERATE FRUIT CROPS: FRUIT TREE DISEASES, VOLS 1 AND 2, 1998, (472): : 277 - 280
  • [23] CONTROL ENGINEERING IN NORTH-AMERICA, 1980
    KJELLSON, U
    SVENSK PAPPERSTIDNING-NORDISK CELLULOSA, 1980, 83 (18): : 512 - 512
  • [24] AUTOCIDAL CONTROL OF SCREWWORMS IN NORTH-AMERICA
    RICHARDSON, RH
    ELLISON, JR
    AVERHOFF, WW
    SCIENCE, 1982, 215 (4531) : 361 - 370
  • [25] Communications Based Positive Train Control Systems Architecture in the USA
    Hartong, Mark
    Goel, Rajni
    Wijesekera, Duminda
    2006 IEEE 63RD VEHICULAR TECHNOLOGY CONFERENCE, VOLS 1-6, 2006, : 2987 - +
  • [26] Key management requirments for Positive Train Control communications security
    Hartong, Mark
    Goel, Rajni
    Wijesekera, Duminda
    Proceedings of the 2006 Joint Rail Conference on Restoring and Upgrading Rail Infrastructure, Rolling Stock and Systems, 2006, 31 : 253 - 262
  • [27] Trust-based secure Positive Train Control (PTC)
    Hartong, Mark
    Goel, Rajni
    Wijesekera, Duminda
    JOURNAL OF TRANSPORTATION SECURITY, 2008, 1 (04) : 211 - 228
  • [28] POSITIVE TRAIN CONTROL AND THE RAIL SAFETY IMPROVEMENT ACT OF 2008
    Hartong, Mark
    Goel, Rajni
    Wijesekera, Duminda
    PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE, VOL 1: RAILROAD INFRASTRUCTURE ENGINEERING SAFETY, SECURITY AND ENVIRONMENT, 2010, : 407 - 414
  • [29] EXPERIENCE WITH A TRACING MODEL FOR A POSITIVE TRAIN CONTROL SYSTEM OF SYSTEMS
    Torrellas, Peter
    Paulish, Daniel J.
    PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE 2012, 2012, : 343 - +
  • [30] Trust-based secure Positive Train Control (PTC)
    Mark Hartong
    Rajni Goel
    Duminda Wijesekera
    Journal of Transportation Security, 2008, 1 (4) : 211 - 228