POSITIVE TRAIN CONTROL IN NORTH AMERICA

被引:6
|
作者
Lindsey, Ronald
机构
来源
IEEE VEHICULAR TECHNOLOGY MAGAZINE | 2009年 / 4卷 / 04期
关键词
D O I
10.1109/MVT.2009.934666
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The positive train control (PTC) which is referred to as communication-based train management (CBTM) is discussed. PTC's core objectives are keep trains from hitting trains and overspeeding and protect workers in work zones. The wireless data platform that supports PTC can also be used for improved resource management. The degree and types of warning and action statements are very subjective, and they are generated based on the use of a continuous prediction process as the train moves down the track. PTC systems provide safeguards against potentially dangerous train-crew errors by bringing a train to a stop when the system determines that the train will exceed (predictive enforcement) its movement authority or track-specific restrictions or has already done so (reactive enforcement) when a prediction capability is not available. The PTC system should operate independent of dispatcher involvement and be transparent to the traffic management processes.
引用
收藏
页码:22 / 26
页数:5
相关论文
共 50 条
  • [1] Positive train control initiatives in North America: technological and institutional issues
    Eilenberg, JE
    COMPUTERS IN RAILWAYS VII, 2000, 7 : 21 - 31
  • [2] POSITIVE TRAIN CONTROL FOR AUSTRALIA
    Reibeling, Charles A.
    IEEE VEHICULAR TECHNOLOGY MAGAZINE, 2009, 4 (04): : 35 - 44
  • [3] INTEROPERABLE POSITIVE TRAIN CONTROL
    Petit, William A.
    IEEE VEHICULAR TECHNOLOGY MAGAZINE, 2009, 4 (04): : 27 - 34
  • [4] Securing positive train control systems
    Hartong, Mark
    Goel, Rajni
    Wijesekera, Duminda
    CRITICAL INFRASTRUCTURE PROTE CTION, 2008, 253 : 57 - +
  • [6] POSITIVE TRAIN CONTROL SYSTEM TESTING
    Gage, Scott
    Polivka, Alan
    Pate, Shad
    Mauger, W. David
    PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE, 2014, 2014,
  • [7] Passenger train stations and holding sidings in North America.
    Giese, E
    Blum
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1907, 51 : 573 - 580
  • [8] Passenger train stations and holding sidings in North America.
    Giese, E
    Blum
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1907, 51 : 527 - 532
  • [9] Headwater control in North America
    Schreier, H
    ENVIRONMENTAL RECONSTRUCTION IN HEADWATER AREAS, 2000, 68 : 191 - 200
  • [10] TIMELY DELIVERY OF MESSAGES IN POSITIVE TRAIN CONTROL
    Bondi, Andre
    Bandara, Damindra
    Smith, Michael
    Goel, Rajni
    Wijesekera, Duminda
    CRITICAL INFRASTRUCTURE PROTECTION VII, 2013, 417 : 139 - 152