A hybrid two-stage flowshop with limited waiting time constraints

被引:65
|
作者
Su, LH [1 ]
机构
[1] Chung Yuan Christian Univ, Dept Ind Engn, Chungli, Taiwan
关键词
limited waiting time constraints; two-stage flowshop; batch processing; heuristics;
D O I
10.1016/S0360-8352(02)00216-4
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper, we consider a hybrid two-stage flowshop with a batch processor in stage 1 and a single processor in stage 2. Each batch processor can process a batch (limited number) of jobs simultaneously. Once the process begins, no job can be released from the batch processor until the entire batch is processed. For each job the waiting time for the second stage cannot be greater than a given upper bound. The objective is to minimize the makespan. The two-stage flowshop sequencing problem with limited waiting constraints was shown to be NP-hard. A heuristic algorithm and a mixed integer program are proposed. The. results of the experimental investigation of the effectiveness of the algorithms are also presented. (C) 2002 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:409 / 424
页数:16
相关论文
共 50 条
  • [41] Bicriteria in a two-stage flowshop scheduling problem
    Bagga, PC
    Bhambani, A
    INDIAN JOURNAL OF PURE & APPLIED MATHEMATICS, 2000, 31 (11): : 1475 - 1481
  • [42] An FPTAS for the parallel two-stage flowshop problem
    Dong, Jianming
    Tong, Weitian
    Luo, Taibo
    Wang, Xueshi
    Hu, Jueliang
    Xu, Yinfeng
    Lin, Guohui
    THEORETICAL COMPUTER SCIENCE, 2017, 657 : 64 - 72
  • [43] A two-stage flexible flowshop problem with deterioration
    Gong, Hua
    Tang, Lixin
    COMPUTING AND COMBINATORICS, PROCEEDINGS, 2008, 5092 : 651 - 660
  • [44] Constructive Backtracking Heuristic for Hybrid Flowshop Scheduling with Limited Waiting Times
    Li, Tieke
    Li, Yan
    2007 INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-15, 2007, : 6671 - 6674
  • [45] Batching in a two-stage flowshop with dedicated machines in the second stage
    Cheng, TCE
    Kovalyov, MY
    Chakhlevich, KN
    IIE TRANSACTIONS, 2004, 36 (01) : 87 - 93
  • [46] A heuristic for scheduling in a two-stage hybrid flowshop with renewable resources shared among the stages
    Figielska, Ewa
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 236 (02) : 433 - 444
  • [47] Scheduling two-stage hybrid flow shop with availability constraints
    Allaoui, H
    Artiba, A
    COMPUTERS & OPERATIONS RESEARCH, 2006, 33 (05) : 1399 - 1419
  • [48] Heuristic algorithms for preemptive scheduling in a two-stage hybrid flowshop with additional renewable resources at each stage
    Figielska, Ewa
    COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 59 (04) : 509 - 519
  • [49] A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines
    Low, Chinyao
    Hsu, Chou-Jung
    Su, Chwen-Tzeng
    COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (03) : 845 - 853
  • [50] Scheduling a two-stage no-wait hybrid flowshop with separated setup and removal times
    Chang, JL
    Yan, WW
    Shao, HH
    PROCEEDINGS OF THE 2004 AMERICAN CONTROL CONFERENCE, VOLS 1-6, 2004, : 1412 - 1416