Research on Surface Settlement of Subway Station Construction Using Pile-Beam-Arch Approach

被引:3
|
作者
Xu, Yushan [1 ]
Tang, Bo [1 ]
Duan, Yanwei [1 ]
机构
[1] JiNan Geotech Engn Co, Jinan, Peoples R China
关键词
Pile-Beam-Arch Approach; Midas-GTS; Surface Settlement and Crustal stress;
D O I
10.1088/1755-1315/455/1/012167
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The pile-beam-arch (PBA) approach is illustrated as a creative construction method in shallow-buried tunneling excavation of subway construction. Attentions have been paid to this method due to its unique advantages of construction technology. Subway station construction by using PBA approach will make disturbance to the ground surface. Research on surface deformation caused by PBA approach is of great significance to the surrounding environment and its structure. The example of subway construction in Beijing is presented as the research background, a three-dimensional model is established by using the Midas-GTS finite element numerical simulation software to simulate the practical excavation support conditions, and to analyze the surface settlement, the initial support structure settlement and crustal stress caused by PBA construction method.
引用
收藏
页数:7
相关论文
共 50 条
  • [21] Study on Stress Field Distribution during the Construction of a Group of Tunnels Using the Pile-Beam-Arch Method
    Huang, Bo
    Du, Yihan
    Zeng, Yu
    Cao, Bing
    Zou, Yu
    Yu, Qian
    BUILDINGS, 2022, 12 (03)
  • [22] Research of surface settlement for a single arch long-span subway station using the Pipe-roof Pre-construction Method
    Yang, Xian
    Li, Yongsuo
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2018, 72 : 210 - 217
  • [23] Enlarging a large-diameter shield tunnel using the Pile-Beam-Arch method to create a metro station
    Liu, Jun
    Wang, Fang
    He, Shaohui
    Wang, Enzhi
    Zhou, Hong
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2015, 49 : 130 - 143
  • [24] Influence of the Large-Span Pile-Beam-Arch Construction Method on the Surface Deformation of a Metro Station in the Silty Clay-Pebble Composite Stratum
    Li, Tao
    Li, Yue
    Yang, Tengyu
    Hou, Rui
    Gao, Yuan
    Liu, Bo
    Qiao, Guogang
    MATERIALS, 2023, 16 (07)
  • [25] Numerical Study on Stratigraphic and Structural Deformation Patterns Considering Surface Load with Pile-Beam-Arch Method Construction
    Zeng, Yu
    Bai, Yao
    Zou, Yu
    Huang, Bo
    SYMMETRY-BASEL, 2022, 14 (09):
  • [26] Study on the mechanical mechanism and control optimization of station subsurface excavation by pile-beam-arch method
    Nan Liu
    Xiao Tong
    Yusheng Jiang
    Renliang Shan
    Ying Li
    Scientific Reports, 15 (1)
  • [27] Study on the Proportion of Stratum Deformation in the Excavation Stage of Metro Station with the Pile-Beam-Arch Method
    Dai, Yongxing
    Pei, Xingkai
    Guo, Guangyao
    Zhang, Huijian
    Chen, Zekun
    INDIAN GEOTECHNICAL JOURNAL, 2024, 54 (02) : 407 - 420
  • [28] Study on the Applicability of an Improved Pile-Beam-Arch Method of Metro Station Construction in the Upper-Soft and Lower-Hard Stratum
    Guo, Xinping
    Jiang, Annan
    Wang, Shanyong
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [30] Deformation control and countermeasures for construction surface when using pile-beam-arch method in confined water-rich sand cross-stratification
    Xue-Gang, Zhang
    Song, Zhan-Ping
    Yuan, Chi-Yu
    Qu, Jian-Sheng
    Electronic Journal of Geotechnical Engineering, 2014, 19 (0Y): : 8727 - 8739