A multi-level heuristic search algorithm for production scheduling

被引:0
|
作者
Yadav, S [1 ]
Xu, Y [1 ]
Xue, D [1 ]
机构
[1] Univ Calgary, Dept Mech & Mfg Engn, Calgary, AB T2N 1N4, Canada
关键词
D O I
10.1080/002075400411475
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper introduces a multi-level heuristic search algorithm for identifying the optimal production schedule considering different levels of manufacturing requirements and constraints. The multi-level heuristic search algorithm generates search nodes at different levels. An upper level search node is composed of lower level search nodes, and evaluated based upon the evaluation of these lower level search nodes using a heuristic function. A production scheduling system was developed based upon the multi-level heuristic search algorithm. In this scheduling system, production requirements and constraints are represented at three different levels: task level, process level, and resource level. A task describes a manufacturing requirement. A process defines a method to achieve the goal of a task. A resource, such as a machine or a person, is a facility for accomplishing a required process. The multi-level heuristic search-based scheduling system was implemented using Smalltalk, an object-oriented programming language. Discussions on scheduling quality and efficiency are addressed at the end of this paper.
引用
收藏
页码:2761 / 2785
页数:25
相关论文
共 50 条
  • [41] A hybrid heuristic search algorithm for scheduling flexible manufacturing systems
    Xiong, HH
    Zhou, MC
    Caudill, RJ
    [J]. 1996 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, PROCEEDINGS, VOLS 1-4, 1996, : 2793 - 2797
  • [42] A hybrid search heuristic for supply chain planning with a multi-level multi-item capacitated lot sizing model
    Shin, H. J.
    [J]. 2007 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2007, : 1584 - 1588
  • [43] Multi-level ray tracing algorithm
    Reshetov, A
    Soupikov, A
    Hurley, J
    [J]. ACM TRANSACTIONS ON GRAPHICS, 2005, 24 (03): : 1176 - 1185
  • [44] AFOPT algorithm for multi-level databases
    Gyorödi, R
    Gyorödi, C
    Pater, M
    Boc, O
    David, Z
    [J]. Seventh International Symposium on Symbolic and Numeric Algorithms for Scientific Computing, Proceedings, 2005, : 129 - 133
  • [45] Experiences with the multi-level algorithm.
    Majumdar, P
    [J]. NUCLEAR PHYSICS B-PROCEEDINGS SUPPLEMENTS, 2003, 119 : 1021 - 1023
  • [46] Improved Heuristic Algorithm for Modern Industrial Production Scheduling
    Jiang Yongqing
    Pan Fucheng
    [J]. 2017 9TH INTERNATIONAL CONFERENCE ON MODELLING, IDENTIFICATION AND CONTROL (ICMIC 2017), 2017, : 1080 - 1084
  • [47] Heuristic scheduling algorithm for steelmaking - Continuous casting production
    Liu, GH
    Li, TK
    Kimura, Y
    [J]. ICIM' 2002: PROCEEDINGS OF THE SIXTH CHINA-JAPAN INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2002, : 121 - 127
  • [48] Improved heuristic algorithm for modern industrial production scheduling
    Jiang, Yongqing
    Pan, Fucheng
    [J]. INTERNATIONAL JOURNAL OF MODELLING IDENTIFICATION AND CONTROL, 2018, 30 (04) : 284 - 292
  • [49] Multi-level and Multi-objective Survey on Cloud Scheduling
    Kessaci, Yacine
    Melab, Nouredine
    Talbi, El-Ghazali
    [J]. PROCEEDINGS OF 2014 IEEE INTERNATIONAL PARALLEL & DISTRIBUTED PROCESSING SYMPOSIUM WORKSHOPS (IPDPSW), 2014, : 481 - 489
  • [50] Trajectory Similarity Search with Multi-level Semantics
    Zheng, Jianbing
    Wang, Shuai
    Jin, Cheqing
    Gao, Ming
    Zhou, Aoying
    Ni, Liang
    [J]. ALGORITHMS AND ARCHITECTURES FOR PARALLEL PROCESSING, ICA3PP 2021, PT III, 2022, 13157 : 602 - 619