Multi-layer and multi-product masks: Cost reduction methodology

被引:8
|
作者
Balasinski, A [1 ]
机构
[1] Cypress Semicond Inc, San Jose, CA 95134 USA
关键词
mask sharing; mask shuttle; stepper throughput; mask cost; business model;
D O I
10.1117/12.569722
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The cost of reticles for sub-100 nm technologies is growing twice as fast as the overall cost of new process development [1]. This makes it necessary to pursue mask cost reduction options alternative to the standard approach of one mask for one layer of one product. The several viable scenarios such as the multi-layer or multi-product (shuttle) masks can be identified by a complex technical and economical analysis, to maximize mask return on investment (ROI) over the product lifetime. The key criteria include matching of layers or products on one plate, with respect to the CD and pattern density commonality and the expected time or fab volume to the conversion to solo mask set. This work discusses the business process and the methodology of such analysis. As an example, by taking into account the cost of the exposure and the mask, one can show that for a 100 nm technology, a positive ROI would be achieved for a product or test vehicle with volume below 50 lots utilizing a multi-layer mask set. A more complete study should include considerations of design rules for blading, stepper capacity, product scheduling, yield variation over the wafer, and probability of database updates. These added restrictions limit the benefits of shared mask methodology.
引用
收藏
页码:351 / 359
页数:9
相关论文
共 50 条
  • [41] LABOR DEMAND, AND MULTI-PRODUCT COST IN SEMI-CONTINUOUS AND MULTI-PROCESS FACILITIES
    ZUDAK, LS
    JOURNAL OF INDUSTRIAL ECONOMICS, 1971, 19 (03): : 267 - 290
  • [42] Multi-product inventory model for cold items with cost and emission consideration
    Bozorgi, Ali
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2016, 176 : 123 - 142
  • [43] A note on cost arrangement and market performance in a multi-product Cournot oligopoly
    Lapan, HE
    Hennessy, DA
    INTERNATIONAL JOURNAL OF INDUSTRIAL ORGANIZATION, 2006, 24 (03) : 583 - 591
  • [44] Simulation optimization of a multi-stage multi-product paint shop line with Response Surface Methodology
    Dengiz, Berna
    Belgin, Onder
    SIMULATION-TRANSACTIONS OF THE SOCIETY FOR MODELING AND SIMULATION INTERNATIONAL, 2014, 90 (03): : 265 - 274
  • [45] A graphical method for carbon dioxide emissions reduction in multi-product plants
    Yap, Jane Y.
    Tan, Jully
    Foo, Dominic C. Y.
    Tan, Raymond R.
    Papadokonstantakis, Stavros
    Badr, Sara
    PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2020, 133 : 51 - 63
  • [46] Flow distance reduction for a multi-product flowline with sets of identical machines
    Diponegoro, A
    Sarker, BR
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 147 (03) : 591 - 612
  • [47] Multi-Layer Decision Methodology For Ranking Z-Numbers
    Ahmad Syafadhli Abu Bakar
    Alexander Gegov
    International Journal of Computational Intelligence Systems, 2015, 8 : 395 - 406
  • [48] Methodology for Multi-Layer Interdigitated Power and Ground Network Design
    Jakushokas, Renatas
    Friedman, Eby G.
    2010 IEEE INTERNATIONAL SYMPOSIUM ON CIRCUITS AND SYSTEMS, 2010, : 3208 - 3211
  • [49] Multi-Layer Decision Methodology For Ranking Z-Numbers
    Abu Bakar, Ahmad Syafadhli
    Gegov, Alexander
    INTERNATIONAL JOURNAL OF COMPUTATIONAL INTELLIGENCE SYSTEMS, 2015, 8 (02) : 395 - 406