共 50 条
- [41] Implementation of an active vibration damping system for the SOFIA telescope assembly GROUND-BASED AND AIRBORNE TELESCOPES V, 2014, 9145
- [42] The suspension assembly of SOFIA, the key subsystem connecting the telescope with the aircraft AIRBORNE TELESCOPE SYSTEMS, 2000, 4014 : 326 - 336
- [43] SOFIA -: A telescope for harsh environments lessons learned for Dome C 1st ARENA Conference on Large Astronomical Infrastructures at CONCORDIA, Prospects and Constraints for Antarctic Optical/IR Astronomy, 2007, 25 (315-320): : 315 - 320
- [44] ANALYSIS AND LIFE TESTING FOR DESIGN OF CRYOGENIC BEARING ASSEMBLIES ON THE JAMES WEBB SPACE TELESCOPE OPTICAL TELESCOPE ELEMENT PROCEEDINGS OF THE ASME INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION, 2013, VOL 9, 2014,
- [46] Exploratory development of a new telescope design: Manufacturing and tests of the Optical Demonstration Model EUROPEAN CONFERENCE ON SPACECRAFT STRUCTURES, MATERIALS AND MECHANICAL TESTING, PROCEEDINGS, 1999, 428 : 37 - 44
- [47] SOFIA Telescope Modal Survey Test and Test-Model Correlation MODELING, SYSTEMS ENGINEERING, AND PROJECT MANAGEMENT FOR ASTRONOMY IV, 2010, 7738
- [48] Doing astronomy with FORCAST, the faint object infraRed CAmera for the SOFIA telescope TETONS 4: GALACTIC STRUCTURE, STARS, AND THE INTERSTELLAR MEDIUM, 2001, 231 : 637 - 638
- [49] Performance Evaluation of the Fiber Optic Gyroscopes integrated into the SOFIA Telescope Assembly SYMPOSIUM GYRO TECHNOLOGY 2009, 2009,
- [50] Image quality prediction for the SOFIA telescope using actual mirror data AIRBORNE TELESCOPE SYSTEMS II, 2002, 4857 : 294 - 299