Optimal deterministic and robust selection of electricity contracts

被引:1
|
作者
Wu, David [1 ]
Viet Hung Nguyen [2 ]
Minoux, Michel [1 ]
Tran, Hai [3 ]
机构
[1] Sorbonne Univ, LIP6 CNRS UMR 7606, Paris, France
[2] Univ Clermont Auvergne, LIMOS, CNRS UMR 6158, Aubiere, France
[3] Energisme SAS, Boulogne, France
关键词
Electricity contract; Convex separable optimization; Robust optimization; Active constraint set; CONVEX-FUNCTIONS SUBJECT; LOAD PROFILES; ALGORITHM; OPTIMIZATION;
D O I
10.1007/s10898-021-01032-z
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We address the Electricity Contract Selection Problem (ECSP), of finding best parameters of an electricity contract for a client based on his/her past records of electricity consumption over a fixed time period. The objective is to optimize the electricity bill composed by some fixed cost, the cost of the subscription of the electricity contract and penalties due to overpowering when consumption exceeds subscribed power. The ECSP can be formulated as a convex separable optimization problem subject to total order constraints. Due to this special structure, ECSP is a special case of two well known classes of convex separable optimization problems, namely the minimum network flow under convex separable cost and minimizing convex separable functions under chain constraints. Both classes are well treated in the litterature and can be solved in polynomial time (Ahuja and Orlin in Oper Res 49(5):784-789, 2001; Ahuja et al. in Manag Sci 49(7):950-964, 2003; Best et al. in SIAM J Optim 10:658-672, 2000; Karzanov and McCormick in SIAM J Comput 26(4):1245-1275, 1997; Minoux in Eur J Oper Res 18(3):377-387, 1984; Minoux, in Gallo and Sandi (eds) Netflow at pisa, mathematical programming studies, Springer, Berlin, 1986). In particular, the algorithm in Ahuja and Orlin (2001) achieves the best theoretical time complexity assuming that computing the objective function value at one specific point can be done in constant time. However, when we work on a big amount of historic data as in ECSP, the time required for evaluating the objective function cannot be assumed to be O(1) anymore. In this paper, we propose a new algorithm for ECSP which is specially designed to reduce the computational effort over large scale historical data. We present numerical results showing that our algorithm outperforms the algorithm in Ahuja and Orlin (2001) when applied to consumption data of various types of clients. A robust version of ECSP based on a Seasonal and Trend decomposition approach for modelling consumption uncertainty is also investigated. The resulting worst-case cost minimization problem is shown to be efficiently solvable using the same algorithm as for deterministic ECSP.
引用
下载
收藏
页码:993 / 1013
页数:21
相关论文
共 50 条
  • [41] The Selection of Power Physical Contracts and Financial Contracts
    Ding Jie
    Yuan Chao
    Li Tian-ran
    Sun Ren-jie
    2019 IEEE 2ND INTERNATIONAL CONFERENCE ON ELECTRONICS AND COMMUNICATION ENGINEERING (ICECE 2019), 2019, : 407 - 411
  • [42] Distributionally Robust Optimal Bidding of Energy Hubs in the Joint Electricity and Carbon Market
    Ma, Lifei
    Liu, Shengwei
    Liu, Jizhen
    FRONTIERS IN ENERGY RESEARCH, 2022, 10
  • [43] A DETERMINISTIC AND PROBABILISTIC APPROACH FOR ROBUST OPTIMAL DESIGN OF A 6-DOF HAPTIC DEVICE
    Ahmad, Aftab
    Andersson, Kjell
    Sellgren, Ulf
    PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, 2013, VOL 3B, 2014,
  • [44] Optimal lending contracts
    At, Christian
    Thomas, Lionel
    OXFORD ECONOMIC PAPERS-NEW SERIES, 2017, 69 (01): : 263 - 277
  • [45] Robust Methods for Identifying Optimal Reservoir Operation Strategies Using Deterministic and Stochastic Formulations
    Ahmadi, Azadeh
    Karamouz, Mohammad
    Moridi, Ali
    WATER RESOURCES MANAGEMENT, 2010, 24 (11) : 2527 - 2552
  • [46] Robust Methods for Identifying Optimal Reservoir Operation Strategies Using Deterministic and Stochastic Formulations
    Azadeh Ahmadi
    Mohammad Karamouz
    Ali Moridi
    Water Resources Management, 2010, 24 : 2527 - 2552
  • [47] OPTIMAL INDEMNITY CONTRACTS
    BLAZENKO, G
    INSURANCE MATHEMATICS & ECONOMICS, 1985, 4 (04): : 267 - 278
  • [48] Optimal Collateralized Contracts
    Cao, Dan
    Lagunoff, Roger
    AMERICAN ECONOMIC JOURNAL-MICROECONOMICS, 2020, 12 (04) : 45 - 74
  • [49] Optimal Contracts for Experimentation
    Halac, Marina
    Kartik, Navin
    Liu, Qingmin
    REVIEW OF ECONOMIC STUDIES, 2016, 83 (03): : 1040 - 1091
  • [50] OPTIMAL MARRIAGE CONTRACTS
    BROWN, M
    JOURNAL OF HUMAN RESOURCES, 1992, 27 (03) : 534 - 550