Optimal deterministic and robust selection of electricity contracts

被引:1
|
作者
Wu, David [1 ]
Viet Hung Nguyen [2 ]
Minoux, Michel [1 ]
Tran, Hai [3 ]
机构
[1] Sorbonne Univ, LIP6 CNRS UMR 7606, Paris, France
[2] Univ Clermont Auvergne, LIMOS, CNRS UMR 6158, Aubiere, France
[3] Energisme SAS, Boulogne, France
关键词
Electricity contract; Convex separable optimization; Robust optimization; Active constraint set; CONVEX-FUNCTIONS SUBJECT; LOAD PROFILES; ALGORITHM; OPTIMIZATION;
D O I
10.1007/s10898-021-01032-z
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We address the Electricity Contract Selection Problem (ECSP), of finding best parameters of an electricity contract for a client based on his/her past records of electricity consumption over a fixed time period. The objective is to optimize the electricity bill composed by some fixed cost, the cost of the subscription of the electricity contract and penalties due to overpowering when consumption exceeds subscribed power. The ECSP can be formulated as a convex separable optimization problem subject to total order constraints. Due to this special structure, ECSP is a special case of two well known classes of convex separable optimization problems, namely the minimum network flow under convex separable cost and minimizing convex separable functions under chain constraints. Both classes are well treated in the litterature and can be solved in polynomial time (Ahuja and Orlin in Oper Res 49(5):784-789, 2001; Ahuja et al. in Manag Sci 49(7):950-964, 2003; Best et al. in SIAM J Optim 10:658-672, 2000; Karzanov and McCormick in SIAM J Comput 26(4):1245-1275, 1997; Minoux in Eur J Oper Res 18(3):377-387, 1984; Minoux, in Gallo and Sandi (eds) Netflow at pisa, mathematical programming studies, Springer, Berlin, 1986). In particular, the algorithm in Ahuja and Orlin (2001) achieves the best theoretical time complexity assuming that computing the objective function value at one specific point can be done in constant time. However, when we work on a big amount of historic data as in ECSP, the time required for evaluating the objective function cannot be assumed to be O(1) anymore. In this paper, we propose a new algorithm for ECSP which is specially designed to reduce the computational effort over large scale historical data. We present numerical results showing that our algorithm outperforms the algorithm in Ahuja and Orlin (2001) when applied to consumption data of various types of clients. A robust version of ECSP based on a Seasonal and Trend decomposition approach for modelling consumption uncertainty is also investigated. The resulting worst-case cost minimization problem is shown to be efficiently solvable using the same algorithm as for deterministic ECSP.
引用
下载
收藏
页码:993 / 1013
页数:21
相关论文
共 50 条
  • [1] Optimal deterministic and robust selection of electricity contracts
    David Wu
    Viet Hung Nguyen
    Michel Minoux
    Hai Tran
    Journal of Global Optimization, 2022, 82 : 993 - 1013
  • [2] Optimal contracts for renewable electricity
    Parlane, Sarah
    Ryan, Lisa
    ENERGY ECONOMICS, 2020, 91
  • [3] Optimal procurement contracts for electricity generation
    Blair, BF
    JOURNAL OF ENVIRONMENTAL ECONOMICS AND MANAGEMENT, 1997, 32 (01) : 125 - 138
  • [4] Optimal Contracts for Agents with Adverse Selection
    Li, Chao
    Qiu, Zhijian
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2020, 2020
  • [5] Optimal Contracts for Wind Power Producers in Electricity Markets
    Bitar, E.
    Giani, A.
    Rajagopal, R.
    Varagnolo, D.
    Khargonekar, P.
    Poolla, K.
    Varaiya, P.
    49TH IEEE CONFERENCE ON DECISION AND CONTROL (CDC), 2010, : 1919 - 1926
  • [6] Implementation of optimal contracts under adverse selection
    Amorós P.
    Moreno B.
    Review of Economic Design, 2001, 6 (1) : 41 - 61
  • [7] Optimal and robust contracts for a risk-constrained principal
    L. C. G. Rogers
    Mathematics and Financial Economics, 2009, 2 : 151 - 171
  • [8] Optimal and robust contracts for a risk-constrained principal
    Rogers, L. C. G.
    MATHEMATICS AND FINANCIAL ECONOMICS, 2009, 2 (03) : 151 - 171
  • [9] OPTIMAL ROBUST STABILIZATION COMPENSATOR DESIGN - A DETERMINISTIC APPROACH
    IONESCU, D
    LIN, JY
    INTERNATIONAL JOURNAL OF CONTROL, 1990, 51 (03) : 585 - 599
  • [10] Interruptible electricity contracts from an electricity retailer's point of view: Valuation and optimal interruption
    Baldick, Ross
    Kolos, Sergey
    Tompaidis, Stathis
    OPERATIONS RESEARCH, 2006, 54 (04) : 627 - 642