Risk-based maintenance policy selection using AHP and goal programming

被引:103
|
作者
Arunraj, N. S. [1 ]
Maiti, J. [1 ]
机构
[1] Indian Inst Technol Khragpur, Dept Ind Engn & Management, Kharagpur, W Bengal, India
关键词
Risk-based maintenance; Multiple criteria decision making; Maintenance policy selection; AHP-GP; BEU; ANALYTIC HIERARCHY PROCESS; PREVENTIVE MAINTENANCE; MULTIPLE CRITERIA; DECISION-MAKING; PRIORITIZATION; FACILITIES; STRATEGY; SYSTEMS; MODEL; RBM;
D O I
10.1016/j.ssci.2009.09.005
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Maintenance policy selection is a multiple criteria decision making. The criteria often considered are cost and reliability of maintenance. There has been a growing interest in using risk of accidents as a criterion for maintenance selection. This paper presents an approach of maintenance selection based on risk of equipment failure and cost of maintenance. Analytic hierarchy process (AHP) and goal programming (GP) are used for maintenance policy selection. A case study in a benzene extraction unit of a chemical plant was done. The AHP results show that considering risk as a criterion, condition based maintenance (CBM) is a preferred policy over time-based maintenance (TBM) as CBM has better risk reduction capability than TBM. Similarly, considering cost as a criterion, corrective maintenance (CM) is preferred. However, considering both risk and cost as multiple criteria, the AHP-GP results show that CBM is a preferred approach for high-risk equipment and CM for low risk equipment. (C) 2009 Elsevier Ltd. All rights reserved.
引用
收藏
页码:238 / 247
页数:10
相关论文
共 50 条
  • [21] On Conditional Value-at-Risk Based Goal Programming Portfolio Selection Procedure
    Kaminski, Bogumil
    Czupryna, Marcin
    Szapiro, Tomasz
    MULTIOBJECTIVE PROGRAMMING AND GOAL PROGRAMMING: THEORETICAL RESULTS AND PRACTICAL APPLICATIONS, 2009, 618 : 243 - +
  • [22] Dynamic portfolio selection with higher moments risk based on polynomial goal programming
    Xu Qi-fa
    Jiang Cui-xia
    Kang Pu
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (14TH) VOLS 1-3, 2007, : 2152 - +
  • [23] Supplier Selection by Using the Goal Programming Approach
    Shahrokhi, Mahmoud
    Sobhani, Zahra
    Bernard, Alain
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: ARTIFICIAL INTELLIGENCE FOR SUSTAINABLE AND RESILIENT PRODUCTION SYSTEMS, PT V, 2021, 634 : 435 - 444
  • [24] An optimal preventive maintenance model using goal programming
    Oke, SA
    Ayomoh, MKO
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2005, 12 (04): : 354 - 364
  • [25] A multicriteria risk-based DSS for bidding using integer programming.
    Zafra-Cabeza, A
    Ridao, MA
    Camacho, EF
    CONTROL APPLICATIONS OF OPTIMISATION 2003, 2003, : 137 - 142
  • [26] Supplier selection by Using AHP-TOPSIS and Goal Programming - A case Study in Casumina Rubber Company - Vietnam
    Ha Thi Xuan Chi
    Do Hoang Ngoc Trinh
    2016 3RD INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND APPLICATIONS (ICIEA 2016), 2016, 68
  • [27] Moving to Risk-Based Highway Asset Maintenance Using Elicited Data
    Raccuja, Gergely
    Cumming, Simon
    Short, Gary
    Graham, Thomas
    Morgan, Stephen
    TRANSPORTATION RESEARCH RECORD, 2024, 2678 (12) : 1454 - 1465
  • [28] A combined fuzzy AHP-goal programming approach to assembly-line selection
    Ayag, Zeki
    Ozdemir, Rifat Guercan
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2007, 18 (04) : 345 - 362
  • [29] APPLICABILITY OF RISK-BASED MAINTENANCE STRATEGY TO A PENSTOCK
    Sedmak, Tamara
    Bakic, Ramo
    Sedmak, Stojan
    Milovic, Ljubica
    Kirin, Snezana
    STRUCTURAL INTEGRITY AND LIFE-INTEGRITET I VEK KONSTRUKCIJA, 2012, 12 (03): : 191 - 196
  • [30] Risk-based maintenance in gas distribution systems
    Limbourg, Philipp
    Kochs, Hans-Dieter
    König, Dirk
    VDI Berichte, 2007, (2018): : 95 - 106