CAUSES OF CONTRACTORS' CLAIMS IN INTERNATIONAL ENGINEERING-PROCUREMENT-CONSTRUCTION PROJECTS

被引:68
|
作者
Shen, Wenxin [1 ]
Tang, Wenzhe [1 ]
Yu, Wenyang [1 ]
Duffield, Colin F. [2 ]
Hui, Felix Kin Peng [2 ]
Wei, Yongping [3 ]
Fang, Jun [4 ]
机构
[1] Tsinghua Univ, Inst Project Management & Construct Technol, State Key Lab Hydrosci & Engn, New Hydraul Bldg, Beijing 100084, Peoples R China
[2] Univ Melbourne, Dept Infrastruct Engn, Melbourne, Vic 3010, Australia
[3] Univ Queensland, Sch Geog Planning & Environm Management, Brisbane, Qld, Australia
[4] Sinohydro Bur 7 Co LTD, Chengdu 610081, Peoples R China
基金
中国国家自然科学基金;
关键词
claims; EPC; risk management; organizational behavior; project definition; international project; Chinese contractors; STRUCTURAL EQUATION MODELS; SAMPLE-SIZE; DISPUTES; DESIGN; MANAGEMENT; QUALITY; DELAY;
D O I
10.3846/13923730.2017.1281839
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Engineering-Procurement-Construction (EPC) method has increasingly been applied in international markets. In this research, the causes of contractors' claims in international EPC projects are modeled and empirically tested with industry survey, structural equation modeling and case studies from the perspective of Chinese contractors. The established model outlines the causes of contractors' claims as: external risk (sociopolitical risks, economic risks, and natural hazards), clients' organizational behavior (untimely payment, change orders, and inefficient processing), and project definition in contract (unclear scope of works, and unclear technical specification). The structural equation modelling validates that these causes have direct influences on claim respectively. Besides, clients' organizational behavior acts as a partial mediation between external risk and claim, demonstrating that external risk can also exert influence on claim through affecting clients' organizational behavior. Seven case studies further confirmed and interpreted the substantive meaning of these relationships. This study establishes interdisciplinary linkages among knowledge areas of contracting, risk management, organizational behavior, and international EPC project delivery, which has important primary contributions in both theory and practice. Understanding how the fundamental factors interactively lead to claims can help contracting parties to develop effective claim strategies, proactively mitigate project risks, and ultimately improve EPC project performance.
引用
收藏
页码:727 / 739
页数:13
相关论文
共 50 条
  • [21] The critical factors in managing relationships in international engineering, procurement, and construction (IEPC) projects of Chinese organizations
    Pal, Raktim
    Wang, Ping
    Liang, Xiaopeng
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (07) : 1225 - 1237
  • [22] Significant causes of claims and disputes in construction projects in Saudi Arabia
    Assaf, Sadi
    Hassanain, Mohammad A.
    Abdallah, Abdullatif
    Sayed, Ahmed M. Z.
    Alshahrani, Abdulrahman
    [J]. BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2019, 9 (05) : 597 - 615
  • [23] Investigating the types, causes and severity of claims in construction projects in the UAE
    Zaneldin, Essam K.
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (05) : 385 - 401
  • [24] Owners' Perception towards Causes of Claims on Construction Projects in Palestine
    Enshassi, Adnan Ali
    Choudhry, Rafiq Mohamed
    El-Ghandour, Said Mohamed
    [J]. ARAB GULF JOURNAL OF SCIENTIFIC RESEARCH, 2008, 26 (03): : 133 - 144
  • [25] Exploring the Sources of Contractors’ Competitive Advantage on International HSR Construction Projects
    Na Zhang
    Xiaopeng Deng
    Xianbo Zhao
    Tengyuan Chang
    [J]. International Journal of Civil Engineering, 2019, 17 : 1115 - 1129
  • [26] ANALYSIS OF SUCCESS CRITERIA IN ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) PROJECTS
    Bahia, Fabio Dias
    de Farias Filho, Jose Rodrigues
    [J]. REVISTA DE GESTAO E PROJETOS, 2010, 1 (02): : 49 - 67
  • [27] Factors Influencing Cost Overruns in Construction Projects of International Contractors in Vietnam
    Thong Quoc Vu
    Cuong Phu Pham
    Thu Anh Nguyen
    Phong Thanh Nguyen
    Phuong Thanh Phan
    Quyen Le Hoang Thuy To Nguyen
    [J]. JOURNAL OF ASIAN FINANCE ECONOMICS AND BUSINESS, 2020, 7 (09): : 389 - 400
  • [28] Exploring the Sources of Contractors' Competitive Advantage on International HSR Construction Projects
    Zhang, Na
    Deng, Xiaopeng
    Zhao, Xianbo
    Chang, Tengyuan
    [J]. INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2019, 17 (7A) : 1115 - 1129
  • [29] Bid/no-bid decision factors for Chinese international contractors in international construction projects
    Li, Guanghua
    Chen, Chuan
    Zhang, Guomin
    Martek, Igor
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (07) : 1619 - 1643
  • [30] CONTRACTORS CONSTRUCTION-CLAIMS AVOIDANCE
    JERGEAS, GF
    HARTMAN, FT
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1994, 120 (03): : 553 - 560