Comparisons of metaheuristic algorithms for unrelated parallel machine weighted earliness/tardiness scheduling problems

被引:12
|
作者
Arik, Oguzhan Ahmet [1 ]
机构
[1] Nuh Naci Yazgan Univ, Dept Ind Engn, TR-38170 Kayseri, Turkey
关键词
Artificial bee colony; Genetic algorithm; Simulated annealing; Earliness; tardiness; Parallel machine; Scheduling; COMMON DUE-DATE; TARDINESS; EARLINESS; ASSIGNMENT; HEURISTICS; COSTS;
D O I
10.1007/s12065-019-00305-7
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper investigates unrelated parallel machine scheduling problems where the objectives are to minimize total weighted sum of earliness/tardiness costs. Three different metaheuristic algorithms are compared with others to determine what kind (swarm intelligence based, evolutionary or single solution) of metaheuristics is effective to solve these problems. In this study, artificial bee colony (ABC), genetic algorithm and simulated annealing algorithm are chosen as swarm intelligence based algorithm, evolutionary algorithm and single solution algorithm. All proposed algorithms are created without modification in order to determine effectiveness of these metaheuristics. Experimental results show that ABC outperforms its opponents in view of solution quality as swarm intelligence based metaheuristic algorithm.
引用
收藏
页码:415 / 425
页数:11
相关论文
共 50 条
  • [41] Exact and metaheuristic approaches for unrelated parallel machine scheduling
    Moser, Maximilian
    Musliu, Nysret
    Schaerf, Andrea
    Winter, Felix
    JOURNAL OF SCHEDULING, 2022, 25 (05) : 507 - 534
  • [42] Single machine scheduling problems with general breakdowns, earliness and tardiness costs
    Federgruen, A
    Mosheiov, G
    OPERATIONS RESEARCH, 1997, 45 (01) : 66 - 71
  • [43] Unrelated parallel machine scheduling problem with energy and tardiness cost
    Zhantao Li
    Haidong Yang
    Shaqing Zhang
    Guosheng Liu
    The International Journal of Advanced Manufacturing Technology, 2016, 84 : 213 - 226
  • [44] Unrelated parallel machine scheduling problem with energy and tardiness cost
    Li, Zhantao
    Yang, Haidong
    Zhang, Shaqing
    Liu, Guosheng
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2016, 84 (1-4): : 213 - 226
  • [45] Robustness of single machine scheduling problems to earliness and tardiness penalty errors
    R.J.W. James
    J.T. Buchanan
    Annals of Operations Research, 1998, 76 : 219 - 232
  • [46] Robustness of single machine scheduling problems to earliness and tardiness penalty errors
    James, RJW
    Buchanan, JT
    ANNALS OF OPERATIONS RESEARCH, 1998, 76 (0) : 219 - 232
  • [47] Scheduling with earliness–tardiness penalties and parallel machines
    Yasmin A. Rios-Solis
    4OR, 2008, 6 : 191 - 194
  • [48] Scheduling problems with two competing agents to minimized weighted earliness-tardiness
    Gerstl, Enrique
    Mosheiov, Gur
    COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (01) : 109 - 116
  • [49] A multi-agent system for the weighted earliness tardiness parallel machine problem
    Polyakovskiy, S.
    M'Hallah, R.
    COMPUTERS & OPERATIONS RESEARCH, 2014, 44 : 115 - 136
  • [50] Parallel machine total tardiness scheduling with a new hybrid metaheuristic approach
    Anghinolfi, Davide
    Paolucci, Massimo
    COMPUTERS & OPERATIONS RESEARCH, 2007, 34 (11) : 3471 - 3490