A Risk-averse Employee Scheduling with Uncertainty Demand

被引:1
|
作者
Liu, Ming [1 ]
Liang, Bian [1 ]
Yang, Xuenan [1 ]
机构
[1] Tongji Univ, Sch Econ & Management, Shanghai, Peoples R China
来源
IFAC PAPERSONLINE | 2019年 / 52卷 / 13期
基金
中国国家自然科学基金;
关键词
Employee Scheduling; Stochastic Programming; Uncertain Demand; Retail; Sample Average Approximation; PROGRAMMING APPROACH; RETAIL; OPERATIONS;
D O I
10.1016/j.ifacol.2019.11.521
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This work studies an employee scheduling problem considering risk aversion under uncertainty demand (i.e., customer traffic) in retailing. Stochastic employee scheduling comprises two stages, the here-and-now decision (i.e., first-stage), before the actual demand is known, is to allocate number of full-time employees to shifts by using some forecast or empirical data; the wait-and-see decision (i.e., second-stage) involving takes some recourse actions, such as recruit part-time employees and extend shift length of full-time employees (i.e, overtime shift), since the actual demand realization. In order to adapt different decision environments, especially facing decision makers with different risk preference, and guarantee scheduling resilience, the risk measure (e.g, conditional value-at-risk (CVaR)) is taken into consideration in the general two-stage stochastic programming framework. A sample average approximation algorithm is used to solve the risk-averse employee scheduling problem with uncertain demand. (C) 2019, IFAC (International Federation of Automatic Control) Hosting by Elsevier Ltd. All rights reserved.
引用
收藏
页码:2134 / 2139
页数:6
相关论文
共 50 条
  • [31] Risk-Averse Model Uncertainty for Distributionally Robust Safe Reinforcement Learning
    Queeney, James
    Benosman, Mouhacine
    [J]. ADVANCES IN NEURAL INFORMATION PROCESSING SYSTEMS 36 (NEURIPS 2023), 2023,
  • [32] A Multi-objective Risk-averse Workforce Planning under Uncertainty
    Jalalvand, Fatemeh
    Turan, Hasan Huseyin
    Elsawah, Sondoss
    Ryan, Michael J.
    [J]. 2020 IEEE SYMPOSIUM SERIES ON COMPUTATIONAL INTELLIGENCE (SSCI), 2020, : 1626 - 1633
  • [33] Environmental regulation and the optimal location of the risk-averse firm under uncertainty
    Isik, M
    [J]. ENVIRONMENT AND DEVELOPMENT ECONOMICS, 2005, 10 : 435 - 452
  • [34] I am not risk-averse
    Leach, RE
    [J]. AMERICAN JOURNAL OF SPORTS MEDICINE, 2000, 28 (06): : 777 - 777
  • [35] Risk-averse firms in oligopoly
    Asplund, M
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ORGANIZATION, 2002, 20 (07) : 995 - 1012
  • [36] Risk Averse Scheduling by a PEV Aggregator Under Uncertainty
    Momber, Ilan
    Siddiqui, Afzal
    Gomez San Roman, Tomas
    Soder, Lennart
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2015, 30 (02) : 882 - 891
  • [37] Time to get risk-averse
    Webzell, Steed
    [J]. Operations Engineer, 2023, 2023 (01): : 14 - 15
  • [38] Spatiotemporal Risk-Averse Routing
    Iqbal, Farabi
    Kuipers, Fernando
    [J]. 2016 IEEE Conference on Computer Communications Workshops (INFOCOM WKSHPS), 2016,
  • [39] Insuring Risk-Averse Agents
    Hines, Greg
    Larson, Kate
    [J]. ALGORITHMIC DECISION THEORY, PROCEEDINGS, 2009, 5783 : 294 - 305
  • [40] SALES AND RISK-AVERSE CONSUMERS
    GALOR, E
    [J]. ECONOMICA, 1983, 50 (200) : 477 - 483