Numerical and experimental research on the rock-breaking process of tunnel boring machine normal disc cutters

被引:53
|
作者
Qi, Geng [1 ]
Wei Zhengying [1 ]
Hao, Meng [1 ]
Qiao, Chen [2 ]
机构
[1] Xi An Jiao Tong Univ, State Key Lab Mfg Syst Engn, Xian, Peoples R China
[2] State Key Lab Shield Machine & Boring Technol, Zhengzhou, Peoples R China
关键词
Full-face rock tunnel boring machine; Rock breaking; User material subroutine; Rotary cutting machine test; FRAGMENTATION; SIMULATION; PERFORMANCE; LEMAITRE;
D O I
10.1007/s12206-016-0329-9
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
A common drawback presented by several numerical rock-breaking studies was that the rocks beneath disc cutters were cut off excessively while the rocks between disc cutters remained, which usually resulted in a smaller cutter spacing than the proper value. To overcome this limitation, the constitutive equations of different rock parts were defined separately using VUMAT, an ABAQUS-based material subroutine. The constitutive model of rock was an application of the Drucker-Prager yield criterion coupled with the Lemaitre damage model. Full-scale rock-breaking tests on a rotary cutting machine were conducted, and 25 groups of orthogonal numerical simulations were carried out. By comparing the normal force, rolling force, and specific energy of numerical results with those of experimental results, the optimal values of the defined parameters D (c1), k, and B were determined to be 9a similar to"10(-4), 0.1 and 0.8, respectively. With the presented numerical method and the determined parameters, the influences of cutter spacing on normal force, rolling force, and specific energy were studied. Both the normal and rolling forces of the first cutting generally remained constant, whereas the forces of the second cutting generally increased linearly with the cutter spacing. The optimal cutter spacing for the studied rock type (Hard sand rock collected from West Qinling tunnel) was approximately 72 mm, which was in accordance with the cutter spacing of the tunnel boring machine applied in this tunnel project.
引用
收藏
页码:1733 / 1745
页数:13
相关论文
共 50 条
  • [41] Experiment Study on High-efficiency Rock-breaking Mechanism of TBM with a Varying Number of Disc Cutters
    Li, Xing
    Chen, Kui
    Fu, Jin-Wei
    Zhang, Bing
    [J]. PROCEEDINGS OF THE 3RD ANNUAL INTERNATIONAL CONFERENCE ON ADVANCED MATERIAL ENGINEERING (AME 2017), 2017, 110 : 251 - 255
  • [42] Simulation and Experimental Research on Disc Cutters Optimal Spacing Based on Rock Breaking Specific Energy
    Wang, He
    Wang, Yanxiang
    Wei, Junkun
    Wen, Kaixiang
    Jin, Yifan
    [J]. ADVANCES IN MACHINERY, MATERIALS SCIENCE AND ENGINEERING APPLICATION, 2022, 24 : 442 - 447
  • [43] Experimental study on rock breaking using a microwave-assisted tunnel boring machine cutter
    Bo Ning
    Fengzhou Liu
    Hao Liu
    YiMin Xia
    [J]. Bulletin of Engineering Geology and the Environment, 2024, 83
  • [44] Study on the Classification and Identification Methods of Surrounding Rock Excavatability Based on the Rock-Breaking Performance of Tunnel Boring Machines
    Zhang, Jianming
    Shi, Kebin
    Majiti, Hadelibieke
    Shan, Hongze
    Fu, Tao
    Shi, Renyi
    Lu, Zhipeng
    [J]. APPLIED SCIENCES-BASEL, 2023, 13 (12):
  • [45] Experimental study on rock breaking using a microwave-assisted tunnel boring machine cutter
    Ning, Bo
    Liu, Fengzhou
    Liu, Hao
    Xia, Yimin
    [J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2024, 83 (04)
  • [46] Numerical simulation and experimental studies of rock-breaking methods for pre-grooving-assisted disc cutter
    Biao Li
    Mengmeng Hu
    Bo Zhang
    Ningbo Li
    Wei Shao
    Lichao Nie
    Wenzheng Cao
    Bin Xu
    [J]. Bulletin of Engineering Geology and the Environment, 2022, 81
  • [47] Numerical simulation and experimental studies of rock-breaking methods for pre-grooving-assisted disc cutter
    Li, Biao
    Hu, Mengmeng
    Zhang, Bo
    Li, Ningbo
    Shao, Wei
    Nie, Lichao
    Cao, Wenzheng
    Xu, Bin
    [J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2022, 81 (03)
  • [48] Disc cutters' layout design of the full-face rock tunnel boring machine (TBM) using a cooperative coevolutionary algorithm
    Sun, Wei
    Huo, Junzhou
    Chen, Jing
    Li, Zhen
    Zhang, Xu
    Guo, Li
    Zhao, Haifeng
    Zhao, Yu
    [J]. JOURNAL OF MECHANICAL SCIENCE AND TECHNOLOGY, 2011, 25 (02) : 415 - 427
  • [49] Disc cutters’ layout design of the full-face rock tunnel boring machine (TBM) using a cooperative coevolutionary algorithm
    Wei Sun
    Junzhou Huo
    Jing Chen
    Zhen Li
    Xu Zhang
    Li Guo
    Haifeng Zhao
    Yu Zhao
    [J]. Journal of Mechanical Science and Technology, 2011, 25
  • [50] Stress and wear analysis of the disc cutter of rock tunnel boring machine
    Jian, Sun
    Peng, Zhou
    Yuhou, Wu
    Jinmei, Yao
    Defang, Zou
    Min, Liu
    [J]. Open Mechanical Engineering Journal, 2015, 9 (01): : 721 - 725