共 50 条
- [42] Recuperated gas turbine integrated with the PFBC combined cycle power plant [J]. THERMAL SCIENCES 2000, 2000, : 467 - 472
- [43] Recuperated gas turbine integrated with the PFBC combined cycle power plant [J]. STROJNISKI VESTNIK-JOURNAL OF MECHANICAL ENGINEERING, 2001, 47 (08): : 462 - 467
- [45] Simulation of a combined cycle gas turbine power plant in Aspen HYSYS [J]. INNOVATIVE SOLUTIONS FOR ENERGY TRANSITIONS, 2019, 158 : 3620 - 3625
- [46] ASSESSMENT OF GAS TURBINE AND COMBINED CYCLE POWER PLANT PERFORMANCE DEGRADATION [J]. PROCEEDINGS OF THE ASME TURBO EXPO 2011, VOL 4, 2012, : 569 - 577
- [47] Modelling the power output from a steam power plant in Nigeria [J]. ENERGY REPORTS, 2020, 6 : 822 - 828
- [48] Thermoeconomic optimization of the retrofit of an existing steam cycle power plant. [J]. OCOS 2000: FROM THERMO-ECONOMICS TO SUSTAINABILITY, PTS 1-4, 2000, : 245 - 258
- [49] Dry Steam Cycle Optimization for the Utilization of Excess Steam at Kamojang Geothermal Power Plant [J]. INTERNATIONAL CONFERENCE ON THERMAL SCIENCE AND TECHNOLOGY (ICTST) 2017, 2018, 1984