Scheduling with generalized and periodic due dates under single- and two-machine environments

被引:4
|
作者
Choi, Byung-Cheon [1 ]
Kim, Kyung Min [2 ]
Min, Yunhong [3 ]
Park, Myoung-Ju [4 ]
机构
[1] Chungnam Natl Univ, Dept Business Adm, 99 Daehak Ro, Daejeon 34134, South Korea
[2] Myongji Univ, Dept Ind Management & Engn, 116 MyongJi Ro, Yongin 17058, Gyeonggi Do, South Korea
[3] Incheon Natl Univ, Grad Sch Logist, 119 Acad Ro, Incheon 22012, Gyeonggi Do, South Korea
[4] Kyung Hee Univ, Dept Ind & Management Syst Engn, 1732 Deogyeong Daero, Yongin 17104, Kyunggi Do, South Korea
基金
新加坡国家研究基金会;
关键词
Scheduling; Generalized due dates; Periodic due dates; Common due date; Computational complexity; UNARY NP-HARDNESS; COMPLETION TIMES; TOTAL DEVIATION; TARDINESS; EARLINESS; MINIMIZE;
D O I
10.1007/s11590-021-01739-8
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider scheduling problems such that the due date is assigned to a job, depending on its position, and the intervals between consecutive due dates are identical. The objective is to minimize the weighted number of tardy jobs or the total weighted tardiness. Both two-machine flow shop and single-machine cases are considered. We establish the computational complexity of each case, based on the relationship with the scheduling problem with a common due date.
引用
收藏
页码:623 / 633
页数:11
相关论文
共 50 条
  • [1] Scheduling with generalized and periodic due dates under single- and two-machine environments
    Byung-Cheon Choi
    Kyung Min Kim
    Yunhong Min
    Myoung-Ju Park
    Optimization Letters, 2022, 16 : 623 - 633
  • [2] Two-Machine Ordered Flow Shop Scheduling with Generalized Due Dates
    Park, Myoung-Ju
    Choi, Byung-Cheon
    Min, Yunhong
    Kim, Kyung Min
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2020, 37 (01)
  • [3] A single machine scheduling with generalized and periodic due dates to minimize total deviation
    Choi, Byung-Cheon
    Kim, Kyung Min
    Min, Yunhong
    Park, Myoung-Ju
    DISCRETE APPLIED MATHEMATICS, 2022, 314 : 31 - 52
  • [4] Single machine scheduling with assignable due dates
    Qi, XT
    Yu, G
    Bard, JF
    DISCRETE APPLIED MATHEMATICS, 2002, 122 (1-3) : 211 - 233
  • [5] Minimizing the range of lateness on a single machine under generalized due dates
    Tanaka, K
    Vlach, M
    INFOR, 1997, 35 (04) : 286 - 296
  • [6] Scheduling in the two-machine flowshop with due date constraints
    Lin, BMT
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 70 (02) : 117 - 123
  • [8] Two-agent scheduling with generalized due dates
    Park, Myoung-Ju
    Min, Yun-Hong
    Choi, Byung-Cheon
    ASIAN JOURNAL OF SHIPPING AND LOGISTICS, 2018, 34 (04): : 345 - 350
  • [9] Two-agent single-machine scheduling with assignable due dates
    Yin, Yunqiang
    Cheng, Shuenn-Ren
    Cheng, T. C. E.
    Wu, Chin-Chia
    Wu, Wen-Hsiang
    APPLIED MATHEMATICS AND COMPUTATION, 2012, 219 (04) : 1674 - 1685
  • [10] Single machine scheduling with deadlines, release and due dates
    Gordon, V
    Potapneva, E
    Werner, F
    ETFA '96 - 1996 IEEE CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, PROCEEDINGS, VOLS 1 AND 2, 1996, : 22 - 26