FLOOD INUNDATION AND DAM BREAK ANALYSIS FOR DISASTER RISK MITIGATION (A CASE STUDY OF WAY APU DAM)

被引:4
|
作者
Ansori, Mohamad Bagus [1 ]
Damarnegara, Anak Agung Ngurah Satria [1 ]
Margini, Nastasia Festy [1 ]
Nusantara, Danayanti Azmi Dewi [2 ]
机构
[1] Inst Teknol Sepuluh Nopember, Fac Civil Planning & Geoengn, Surabaya, Indonesia
[2] Univ Negeri Surabaya, Fac Engn, Surabaya, Indonesia
来源
INTERNATIONAL JOURNAL OF GEOMATE | 2021年 / 21卷 / 84期
关键词
Way Apu dam; Flood inundation; Dam break; Hec-Ras; 5.0.7; MODEL;
D O I
10.21660/2021.84.j2130
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents a numerical modeling to simulate flood inundation and dam break analysis of Way Apu dam for an emergency action plan (EAP), by considering EAP guidelines for ICOLD (International Committee on Large Dam). The Way Apu dam, located in Way Apu River, Maluku, Indonesia is a multi-purpose dam constructed mainly for irrigation, hydropower, water supply, and flood control. Therefore, the dam's outflow discharge needs to be analyzed, due to the large amount of rainfall in eastern Indonesia. Thus, there is a need to analyze flood inundation mapping and dam break simulation in a bid to identify the flood mitigation risk zone and early warning system, within the downstream area of Way Apu dam. In this study, the flood inundation mapping and dam break simulation were analyzed using HEC-RAS 5.0.7. The analysis results of flood routing generate the outflow peak discharge reduction over spillway were 7.36 % (Ten years return period discharge, Q(10)) and just 2.14% (Probable maximum flood discharge, Q(PMF)), indicating the simulation results of Hec-Ras 5.0.7 model for conditions with or without dam break did not show significant difference in dam's downstream area. According to these results, 6 sub-districts are affected by the flood (Grandeng, Waeleman, Wanakarta, Waenetat, Debowae, Mako) with a maximum flood height range between 1-2.5 m (Q(10)) and 2.9-4.2 m (Q(PMF)). The simulation results of arrival time also showed the estimation of evacuation time for Q(PMF )ranges from 6 - 12 hours.
引用
收藏
页码:85 / 92
页数:8
相关论文
共 50 条
  • [31] Analysis of effects of flood wave caused by large dam break
    Sopta, Luka
    Druzeta, Sinsa
    Holjevic, Danko
    [J]. GRADEVINAR, 2011, 63 (08): : 741 - 748
  • [32] Study on the Risk Assessment of the Tailings Dam Break
    Zheng Xin
    Xu Xiaohu
    Xu Kaili
    [J]. ISMSSE 2011, 2011, 26
  • [33] Risk analysis for flood prevention and safety of dam
    Mei, Ya-Dong
    Tan, Guang-Ming
    [J]. Wuhan Daxue Xuebao (Gongxue Ban)/Engineering Journal of Wuhan University, 2002, 35 (06):
  • [34] Risk and uncertainty analysis for dam overtopping - Case study: The Doroudzan Dam, Iran
    Goodarzi, Ehsan
    Lee, Teang Shui
    Ziaei, Mina
    [J]. JOURNAL OF HYDRO-ENVIRONMENT RESEARCH, 2014, 8 (01) : 50 - 61
  • [35] 2D Hydraulic Modelling of Dam Break Analysis Using MIKE FLOOD for Kenyir Dam
    Shah, Mohd Rashid Mohd
    Sidek, Lariyah Mohd
    Yalit, Mohd Ruzaimei
    Marufuzzaman, Mohammad
    Basri, Hidayah
    Yaacob, Mustapha Kamal
    [J]. PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON DAM SAFETY MANAGEMENT AND ENGINEERING, ICDSME 2019, 2020, : 214 - 225
  • [36] 2D FLOOD MODELLING: THE CASE OF TOUS DAM BREAK
    Bellos, Vasilis
    Tsakiris, George
    [J]. PROCEEDINGS OF THE 36TH IAHR WORLD CONGRESS: DELTAS OF THE FUTURE AND WHAT HAPPENS UPSTREAM, 2015, : 4687 - 4698
  • [37] Dam-break risk analysis of the Attabad landslide dam in Pakistan and emergency countermeasures
    Xiaoqing Chen
    Peng Cui
    Yong You
    Zunlan Cheng
    Asif Khan
    Chengyin Ye
    Shu Zhang
    [J]. Landslides, 2017, 14 : 675 - 683
  • [38] Dam-break risk analysis of the Attabad landslide dam in Pakistan and emergency countermeasures
    Chen, Xiaoqing
    Cui, Peng
    You, Yong
    Cheng, Zunlan
    Khan, Asif
    Ye, Chengyin
    Zhang, Shu
    [J]. LANDSLIDES, 2017, 14 (02) : 675 - 683
  • [39] Pedestrian evacuation planning under dam-break flood disaster considering road risk and road pedestrian demand
    Wang, Wei
    Li, Yingbing
    Zhang, Yan
    Wu, Zhichao
    [J]. INTERNATIONAL JOURNAL OF DISASTER RISK REDUCTION, 2024, 104
  • [40] Dam-Break Flood Model Uncertainty Assessment: Case Study of Extreme Flooding with Multiple Dam Failures in Gangneung, South Korea
    Kim, Byunghyun
    Sanders, Brett F.
    [J]. JOURNAL OF HYDRAULIC ENGINEERING, 2016, 142 (05)