Commercial buildings: Power plants for a deregulated utility market

被引:0
|
作者
Hathaway, AM [1 ]
机构
[1] ICF Kaiser, Fairfax, VA 22031 USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The electric utility industry is a $250 billion market with a steady stream of revenue poring in at the rate of 12 to 15% from a still captive rate base. Even though deregulation of the electric market has only just begun, utilities across the country are changing their investment strategy for power generation, transmission or distribution equipment for fear of getting stuck with stranded costs. Where will they spend their growing cash reserves? Many are paying down their potential stranded assets, others are looking at international markets, while some are diversifying into ventures, such as telecommunications and cable television. With so many abandoning the traditional electric systems and services we have come to take for granted, one might ask, which utilities are going to invest in the needed infrastructure to continue to provide America's growing appetite for electricity? The United Stares building construction industry spends up to $100 billion a year on new construction projects. Developers continue to add more electric consuming buildings at a rate of 1.1 percent per year(1) to the 57.8 billion stock of US commercial building space(2). In 1998, developers will construct 600 million square feet of new structures requiring 5-8 gigawatts of electricity and costing $10 to $20 billion in new power stations, transmission lines and distribution equipment. Are utilities going to make the necessary investments now, and attempt to recover those costs through increased rates with deregulation coming? It is doubtful. With utilities looking elsewhere for growing their business it appears we may be headed for more power blackouts like those experienced last year in the West.
引用
收藏
页码:43 / 48
页数:6
相关论文
共 50 条
  • [41] The importance of energy management systems in the deregulated power market
    Forsyth, D.
    Ahmad, B.
    [J]. PULP & PAPER-CANADA, 2009, 110 (02) : 23 - 26
  • [42] Unit Commitment with Transmission constraints in Deregulated Power market
    Rabbuni, G.
    Kumar, G. Guru
    [J]. 2015 INTERNATIONAL CONFERENCE ON ELECTRICAL, ELECTRONICS, SIGNALS, COMMUNICATION AND OPTIMIZATION (EESCO), 2015,
  • [43] Short-term scheduling for hydroelectric power plants in a deregulated power market by means of a deep deterministic policy gradient algorithm
    Bremdal, Bernt
    Ilieva, Iliana
    [J]. 2024 4TH INTERNATIONAL CONFERENCE ON APPLIED ARTIFICIAL INTELLIGENCE, ICAPAI, 2024, : 34 - 41
  • [44] How Virginia Power plans to succeed in a deregulated market
    Heacock, D
    [J]. NUCLEAR ENGINEERING INTERNATIONAL, 1999, 44 (534): : 36 - 37
  • [45] The importance of energy management systems in the deregulated power market
    Forsyth, D.
    Ahmad, B.
    [J]. Pulp and Paper Canada, 2009, 110 (02): : 23 - 26
  • [46] The development of the German power plant park in the deregulated market
    Brockmeier, U
    [J]. ATW-INTERNATIONAL JOURNAL FOR NUCLEAR POWER, 2004, 49 (05): : 308 - +
  • [47] Stochastic Based Reactive Power Market in Deregulated Environment
    Kamali, Roozbeh
    [J]. INTERNATIONAL REVIEW OF ELECTRICAL ENGINEERING-IREE, 2011, 6 (04): : 2020 - 2028
  • [48] Optimal management of an industrial power plant in a deregulated market
    Rossi, F
    Russo, A
    [J]. UPEC 2004: 39th International Universitities Power Engineering Conference, Vols 1-3, Conference Proceedings, 2005, : 1073 - 1077
  • [49] The dynamics of market power with deregulated electricity generation supplies
    Schuler, RE
    [J]. PROCEEDINGS OF THE THIRTY-FIRST HAWAII INTERNATIONAL CONFERENCE ON SYSTEM SCIENCES, VOL III: EMERGING TECHNOLOGIES TRACK, 1998, : 9 - 14
  • [50] Reactive power expansion planning under a deregulated market power system
    Boroujeni, Babak Sepahi
    Boroujeni, Sayed Mojtaba Shirvani
    Memaripour, Ahmad
    [J]. Research Journal of Applied Sciences, Engineering and Technology, 2012, 4 (19) : 3755 - 3759