Research on Target Cost Management of Construction Project with VBQ Based on EVM

被引:1
|
作者
Xu Bing [1 ]
机构
[1] N China Univ Technol, Sch Econ & Management, Beijing, Peoples R China
关键词
earned value method; valuation with bill quantity; target cost management;
D O I
10.1109/ICIII.2009.412
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Earned Value Method (EVM) is a basic approach of project cost management. However, this method did not be effectively used in construction project cost management. In accordance with national planning, valuation with bill quantity (VBQ) will be the main valuation mode of construction project in future. According to Code of valuation with bill quantity of construction works (GB50500-2008) and the requirements of EVM, this paper analysis the price compositions and characteristics of construction project under VBQ, decompose and induce various cost elements which contained in the project reasonable, and formed target cost control baseline which use EVM to control construction project cost. The method this paper presents can combine project pricing and project progress effectively, and provides a feasible way for applying EVM in construction project cost management.
引用
收藏
页码:427 / 430
页数:4
相关论文
共 50 条
  • [1] The Research on Target Cost Management of Construction Enterprise Project
    Xu, Hui
    [J]. 2011 INTERNATIONAL CONFERENCE ON ECONOMIC, EDUCATION AND MANAGEMENT (ICEEM2011), VOL III, 2011, : 137 - 140
  • [2] Research on Target Cost Control of Construction Project based on Goal Programming
    Zhao, H.
    He, G.
    [J]. 2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2009, : 482 - 485
  • [3] Research of Cost Management of Construction Project Based on Value Chain
    Wu, Yaqiong
    Luo, Fuzhou
    [J]. INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT (EBM2011), VOLS 1-6, 2011, : 1382 - 1384
  • [4] Construction Project Bidding Research Based on Game Theory and Target Cost Pre-control Management
    Xu, Ning
    Xu, Qiuyue
    Li, Qiming
    [J]. PROCEEDINGS OF THE 20TH INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, 2017, : 875 - 882
  • [5] Construction project cost information management research
    Wen, Zhen
    [J]. ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 1433 - 1436
  • [6] Management Research on the Construction Enterprise Project Cost
    Zhang, Hai Yan
    Zhao, Jin Wei
    [J]. ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2193 - +
  • [7] Cost Control research in Construction Project Management
    Wang, Danjing
    [J]. 2013 3RD INTERNATIONAL CONFERENCE ON EDUCATION AND EDUCATION MANAGEMENT (EEM 2013), 2013, 25 : 439 - 443
  • [8] Cost/Schedule Monitoring and Forecasting for Project Based on Earned Value Management (EVM)
    Huang, Jianwen
    Pan, Huimin
    Li, Yan
    Zhu, Yiting
    Liao, Zaiyi
    [J]. ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 1437 - +
  • [9] The Cost Management of Construction Project Based on Lean Management
    Liu, X. W.
    Wu, Z. G.
    He, R. L.
    [J]. CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1861 - 1867
  • [10] Research on Project Cost Management Model of Ecological Construction
    Liu Feng
    Wang Junmin
    [J]. MATERIALS ENGINEERING FOR ADVANCED TECHNOLOGIES, PTS 1 AND 2, 2011, 480-481 : 1197 - +