Analysis of the outcome features of effective monitoring and evaluation in construction project delivery

被引:1
|
作者
Tengan, Callistus [1 ,2 ]
Aigbavboa, Clinton Ohis [3 ]
Guribie, Francis [4 ]
Annor-Asubonteng, Joseph [5 ]
机构
[1] Univ Johannesburg, Fac Engn & Built Environm, SARChI Sustainable Construct Management & Leaders, Johannesburg, South Africa
[2] Bolgatanga Polytech, Bldg Technol, Bolgatanga, Ghana
[3] Univ Johannesburg, Construct Management & Quant Surveying, Johannesburg, South Africa
[4] Tamale Tech Univ, Tamale, Ghana
[5] Bolgatanga Polytech, Bolgatanga, Ghana
关键词
Evaluation; Construction; Monitoring; Factor analysis; Outcome features;
D O I
10.1108/JEDT-03-2019-0076
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose This study aims to analyze the outcome features of effective monitoring and evaluation in construction projects delivery. Design/methodology/approach The study adopted a quantitative research approach. Questionnaire survey was administered to 230 participants who were drawn from metropolitan, municipal, district assemblies and regional coordinating councils in Ghana. Data collected were analyzed to determine the key and underlying monitoring and evaluation outcome features in project delivery. A Cronbach's alpha value of 0.953 was achieved based on standardized items, while the Kaiser-Meyer-Olkin measure of sampling adequacy recorded was 0.876. The result of Bartlett's test of sphericity also revealed a significance level of 0.000 (p < 0.05). Findings The study discovered that value for money, successful project closure, end-user satisfaction, timely completion of projects and fitness for purpose were the top five monitoring and evaluation outcome features. Similarly, three principal monitoring and evaluation outcome features were identified, namely, performance, satisfaction and value outcome. Practical implications - The study, thus, seeks to guide project planning and implementation of effective construction project M&E. Originality/value The study contributes to the body of knowledge by establishing top and key success outcomes (KSO) in the implementation of monitoring and evaluation.
引用
收藏
页码:1192 / 1201
页数:10
相关论文
共 50 条
  • [41] PROJECT DELIVERY SYSTEMS FOR CONSTRUCTION PROJECTS - CLOSURE
    KETTLE, KA
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1978, 104 (01): : 105 - 105
  • [42] Effect of bond administration on construction project delivery
    Oke, Ayodeji Emmanuel
    ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2016, 8 (01): : 1390 - 1396
  • [43] The Prostate Cancer Risk Stratification (ProCaRS) Project: Database Construction and Outcome Analysis
    Rodrigues, G.
    Gonzalez-Maldonado, S.
    Lukka, H.
    Warde, P.
    Brundage, M.
    Souhami, L.
    Crook, J.
    Catton, C.
    Martin, A.
    Pickles, T.
    INTERNATIONAL JOURNAL OF RADIATION ONCOLOGY BIOLOGY PHYSICS, 2012, 84 (03): : S57 - S57
  • [44] Post-mortem analysis on the analysis and evaluation of risks in construction project management
    Schieg, Martin
    JOURNAL OF BUSINESS ECONOMICS AND MANAGEMENT, 2007, 8 (02) : 145 - 153
  • [45] CARVAJAL AND THE WILL TO BE ARCHITECT: THE CONSTRUCTION OF THE PROJECT AND EFFECTIVE BEAUTY
    Labarta Aizpun, Carlos
    Tarrago Mingo, Jorge
    PROYECTO PROGRESO ARQUITECTURA, 2015, (12)
  • [46] The health and safety impact of construction project features
    Manu, Patrick
    Ankrah, Nii
    Proverbs, David
    Suresh, Subashini
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2014, 21 (01) : 65 - +
  • [47] A Review of Monitoring Construction Equipment in Support of Construction Project Management
    Nakanishi, Yutaro
    Kaneta, Takashi
    Nishino, Sayaka
    FRONTIERS IN BUILT ENVIRONMENT, 2022, 7
  • [48] Effective Monitoring and Evaluation of Grain for Green Project in the Upper and Middle Reaches of the Yangtze River
    Liu, Zuying
    Wang, Bing
    Zhao, Yusen
    Niu, Xiang
    POLISH JOURNAL OF ENVIRONMENTAL STUDIES, 2019, 28 (02): : 729 - 738
  • [49] Sustainability in Construction Project Delivery: A Study of Experienced Project Managers in Nigeria
    Zuofa, Tarila
    Ochieng, Edward
    PROJECT MANAGEMENT JOURNAL, 2016, 47 (06) : 44 - 55
  • [50] Application of factor analysis in risk evaluation of basketball arena project construction
    Hu, Ronghui
    Computer Modelling and New Technologies, 2014, 18 (11): : 616 - 620