Unrelated Parallel-Machine Scheduling with Maintenance Activities and Rejection Penalties for Minimizing Total Cost

被引:0
|
作者
Yang, Xiaona [1 ,2 ]
Peng, Can [1 ]
Jin, Lei [1 ]
Li, Qiangyi [3 ]
机构
[1] Nanjing Univ Aeronaut & Astronaut, Coll Econ & Management, 29 Jiangjun Rd, Nanjing 211106, Jiangsu, Peoples R China
[2] Henan Univ Sci & Technol, Management Sch, Luoyang, Henan, Peoples R China
[3] Nanjing Univ Aeronaut & Astronaut, Coll Comp Sci & Technol, Nanjing, Jiangsu, Peoples R China
关键词
unrelated parallel-machine; rejection; maintenance activities; total cost; ALGORITHM;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
During the production process, regular maintenance is necessary and important to maintain high efficiency, because machines inevitably fail with increasing use. However, certain tasks are often neglected due to time and budget constraints, and other factors. In this regard, we propose the unrelated parallel-machine scheduling problem with maintenance and rejection penalties, wherein the ultimate objective is to minimize total cost while identifying the optimal maintenance frequencies, optimal maintenance positions, set of rejected jobs, and optimal scheduled job sequence. Considering resource constraints, the maintenance cost is controlled by the upper bound of the total maintenance frequency. Based on these factors, the optimal polynomial-time solution and its computational complexity with a fixed number of machines are presented. As an illustrative example, it was determined that the scheduling method proposed in this report is effective and practical.
引用
收藏
页码:787 / 795
页数:9
相关论文
共 50 条
  • [1] Unrelated parallel-machine scheduling with maintenance activities and rejection penalties for minimizing total cost
    Yang, Xiaona
    Peng, Can
    Jin, Lei
    Li, Qiangyi
    [J]. International Journal of Automation Technology, 2019, 13 (06): : 787 - 795
  • [2] Unrelated parallel-machine scheduling with deteriorating maintenance activities
    Cheng, T. C. E.
    Hsu, Chou-Jung
    Yang, Dar-Li
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 60 (04) : 602 - 605
  • [3] Minimizing total tardiness in an unrelated parallel-machine scheduling problem
    Shim, S-O
    Kim, Y-D
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2007, 58 (03) : 346 - 354
  • [4] Note on "Unrelated parallel-machine scheduling with deteriorating maintenance activities"
    Yang, Suh-Jenq
    Hsu, Chou-Jung
    Yang, Dar-Li
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 62 (04) : 1141 - 1143
  • [5] Unrelated parallel-machine scheduling with deteriorating maintenance activities to minimize the total completion time
    Li-Yan Wang
    Xue Huang
    Ping Ji
    En-Min Feng
    [J]. Optimization Letters, 2014, 8 : 129 - 134
  • [6] Unrelated parallel-machine scheduling with deteriorating maintenance activities to minimize the total completion time
    Wang, Li-Yan
    Huang, Xue
    Ji, Ping
    Feng, En-Min
    [J]. OPTIMIZATION LETTERS, 2014, 8 (01) : 129 - 134
  • [7] Unrelated parallel-machine scheduling with deterioration effects and deteriorating multi-maintenance activities for minimizing the total completion time
    Yang, Suh-Jenq
    [J]. APPLIED MATHEMATICAL MODELLING, 2013, 37 (05) : 2995 - 3005
  • [8] Unrelated parallel-machine scheduling with deteriorating jobs and rejection
    Hsu, Chou-Jung
    Chang, Chia-Wen
    [J]. INFORMATION TECHNOLOGY APPLICATIONS IN INDUSTRY, PTS 1-4, 2013, 263-266 : 655 - 659
  • [9] Unrelated parallel-machine scheduling problems with aging effects and deteriorating maintenance activities
    Hsu, Chou-Jung
    Ji, Min
    Guo, Jia-Yuarn
    Yang, Dar-Li
    [J]. INFORMATION SCIENCES, 2013, 253 : 163 - 169
  • [10] Unrelated parallel-machine scheduling with aging effects and multi-maintenance activities
    Yang, Dar-Li
    Cheng, T. C. E.
    Yang, Suh-Jenq
    Hsu, Chou-Jung
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (07) : 1458 - 1464