共 50 条
- [5] Unrelated parallel-machine scheduling with deteriorating maintenance activities to minimize the total completion time [J]. Optimization Letters, 2014, 8 : 129 - 134
- [8] Unrelated parallel-machine scheduling with deteriorating jobs and rejection [J]. INFORMATION TECHNOLOGY APPLICATIONS IN INDUSTRY, PTS 1-4, 2013, 263-266 : 655 - 659